9
Operating Instructions
Burco boilers are designed for continuous operation and should only be switched off for the purpose of
maintenance or emergency.
Boiler Overview
This product is supplied with a power cord. Connection to electrical outlet is required and should be carried out by
qualified personnel to the appropriate standards. Appliance not available with a standard 13Amp UK 3 pin plug.
Controller Overview
Before general use, please follow these important commissioning steps:
Ensure boiler is connected to the mains water supply.
Turn on the mains power and press and hold the power button
for 10 seconds. The boiler should begin
filling and heating.
Ensure boiler is set to
98˚C, fully drain the boiler contents from the tap and repeat.
Boiler should be fully
drained twice before general use.