background image

Page 7

1.  Insert an empty brew funnel into the funnel rails for the 

brew station(s).

2.  Place an empty server(s) under the brew funnel(s).

3.  Connect the brewer to the power source. Turn on the main 

power switch.

4.  Water will flow into the tank and stop when the tank is filled 

to its capacity. 

5.  Wait approximately twenty-five minutes for the water in the 

tank to heat to the proper temperature. Some water may drip 

from the funnels during this time; this is due to expansion 

and should not occur thereafter.

6.  Once the tank is full of water and heated to proper tempera-

ture, place a small vessel beneath the faucet and open the 

faucet handle. Release it when you hear the tank refilling.

7.  Water volumes and flow settings have been preset at the 

factory. Refer to programming should the volume need to 

be increased or decreased.

8.  The brewer is now ready for use in accordance with the 

instructions for Coffee Brewing.

INITIAL SET-UP

Brew water temperature is factory set at 200° F (93.3°C)

Areas of high altitude will require lowering this temperature

to prevent boiling. This chart should be used as a guide 

when readjusting the brew water temperature.

NOTICE

Altitude

(Feet)

101.0

100.5

100.0

99.5

99.0

98.5

98.0

97.4

96.9

96.4

95.9

95.4

94.9

94.4

93.9

93.4

92.9

92.4

91.9

91.4

90.8

90.3

89.8

200

200

200

200

200

200

200

200

199

198

197

196

195

195

194

193

192

191

190

189

188

187

186

93.3

93.3

93.3

93.3

93.3

93.3

93.3

93.3

92.8

92.2

91.7

91.1

90.6

90.6

90.0

89.4

88.9

88.3

87.8

87.2

86.7

86.1

85.6

35665.0000A   05/04 © 2004  Bunn-O-Matic Corporation

213.8

212.9

212.0

211.1

210.2

209.3

208.4

207.4

206.5

205.6

204.7

203.8

202.9

201.9

201.0

200.1

199.2

198.3

197.4

196.5

195.5

194.6

193.7

-1000

-500

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000

7500

8000

8500

9000

9500

10000

Boiling point

of water

°F            °C

Recommended

water temperature

°F            °C

COFFEE BREWING

There may be certain situations in which the brew cycle will not begin when BREW is selected:

 

a.  BREW TEMPERATURE TOO LOW - wait until heated, or cancel BREW LOCKOUT option.

 

b.  CHECK FUNNEL - remove funnel, empty previously brewed grounds and replace with fresh.

BREWING COFFEE WITHOUT A SMART FUNNEL AND MHG or DBC GRINDER:

1.  Begin each brew cycle with a clean empty

 

brew funnel.

2.  Insert a BUNN filter into the funnel.

3.  Pour the fresh coffee into the filter and level the bed of grounds by gently shaking.

4.  Slide the funnel into the funnel rails of the selected side until it stops.

5.  Place an empty server under the funnel.

6.  Select the desired recipe by selecting the button above the batch selections. If there are more than 6 recipes 

stored in the brewer, use the scroll arrow to navigate to the desired recipe.

7. 

Select the desired batch size for the recipe.

8.  Select the START BREW button. For twin models, ensure to select the brew button for the side of the brewer 

that is loaded with freshly ground coffee.

9.  The display will read BREWING and show the time remaining in the brew cycle. Select the STOP button to 

discontinue the brewing if necessary.

10. Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops.

55502

 000000

Summary of Contents for ITCB DV

Page 1: ...55502 0000A 06 18 2018 Bunn O Matic Corporation To ensure you have the latest revision of the Operating Manual Illustrated Parts Catalog Programming Manual or Service Manual please visit the Bunn O M...

Page 2: ...y such individuals whether oral or written do not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that the equipment does not conform to the warranty BUNN...

Page 3: ...mes bypass percentages pulse brew dilution etc This allows the operator to program a certain recipe for each coffee or tea flavor to be brewed The Infusion Series Coffee and Tea Brewer is able to brew...

Page 4: ...rvice areas permitted by Authorized Service personnel only Operator NOTICES Carefully read and follow all notices in this manual and on the equipment All labels on the equipment should be kept in good...

Page 5: ...be hooked up later be sure the brewer is disconnected from the power source If plumb ing has been hooked up the brewer is ready for Initial Set Up ELECTRICAL REQUIREMENTS ITCB DV DUAL VOLT TOGGLE SWIT...

Page 6: ...this equipment REQUIRED 1 25 gpm 4 73 lpm flow rate from water supply line NOTE Bunn O Matic recommends 3 8 copper tubing for all installations from the 1 2 water supply line A tight coil of tubing in...

Page 7: ...87 8 87 2 86 7 86 1 85 6 35665 0000A 05 04 2004 Bunn O Matic Corporation 213 8 212 9 212 0 211 1 210 2 209 3 208 4 207 4 206 5 205 6 204 7 203 8 202 9 201 9 201 0 200 1 199 2 198 3 197 4 196 5 195 5...

Page 8: ...ting a Smart Funnel onto the funnel rails the brewer will automatically add the coffee name if it doesn t exist in programming In this event the display will prompt the operator to verify that the rec...

Page 9: ...nd by pass outlet fitting Rotate several times to remove any mineral deposits from the fitting 4 Prepare a warm soapy solution with nonabrasive liquid detergent 140 F Then use a clean damp cloth wette...

Page 10: ...logo for 2 seconds to enter the programming C BATCH SELECTOR SWITCHES Coffee Batch Icons Selecting the icon corresponding to Small Medium and Large batch selects the amount of product to be brewed on...

Page 11: ...ode the display will automatically return to the home screen SERVICE ACCESS To access this menu touch the BUNN logo for 2 seconds with the home screen present This is the first screen that will appear...

Page 12: ...selecting ENTER By default entering 7738 on this screen will allow permission for setting a password Setting a password will prevent entry into the Service Menu SERVICE MENU To access this menu select...

Page 13: ...ng out of the bypass The procedure includes a 1 minute dispense of hot water to determine the actual flow rate Ensure that the brewer is heated to brewing temperature before performing a bypass calibr...

Page 14: ...IT screen will appear on the display If necessary use the scroll arrow at the top of the screen to navigate to the desired recipe name to edit Select the recipe name NOTE Blue filled buttons represent...

Page 15: ...e recipe parameter screen BYPASS ITCB HV Only This icon adjusts the bypass as a percentage of the total brew volume This means the set percentage will bypass the coffee grounds through the funnel to t...

Page 16: ...ing the routine the total brew time will change to be shorter or longer depending on the routine settings Longer pause times extend total brew time in most cases The Auto calculate button will automat...

Page 17: ...e that the tank attempts to heat to and maintain and at what threshold the system allows brewing to occur if brew lockout is on The tank set temp is the set point that the heater tries to control to a...

Page 18: ...be taken directly to the set up screens BREW SETTINGS Users can press the temp set temperature number to go to a keypad entry screen to change the value The ready temperature will work similarly but c...

Page 19: ...Page 19...

Reviews: