background image

Page 10

PROGRAMMING

Using the menu-driven display on the front of the brewer, the operator has the ability to alter or modify various 

brewing parameters such as brew temperatures, brew volumes, bypass, pulse brew, pre-infusion, smartWAVE, 

drip time and fresh time. The operator can customize the brewing process to their specifications, allowing for 

the precise brewing of various flavors of coffee.

OPERATING CONTROLS

To access the programming mode, and to scroll through the different function screens, onscreen programming 

buttons are used. 

A. BREW Left/Right

 

When the main screen is visible, select the BREW button to begin a brew cycle on the selected side.

B. PROGRAMMING

 

Touch the BUNN logo for 2 seconds to enter the programming.

C. BATCH SELECTOR SWITCHES (Coffee Batch Icons)

  Selecting the icon corresponding to Small, Medium, and Large batch selects the amount of product 

to be brewed on the selected side. The highlighting of the icon indicates the selected batch to brew. Coffee 

Batch Icons will only appear if a coffee recipe is selected from the Recipe Library.

D. BATCH SELECTOR SWITCHES (Tea Batch Icons)

  Selecting the icon corresponding to Small, Medium, and Large batch selects the amount of product 

to be brewed on the selected side. The highlighting of the icon indicates the selected batch to brew. Tea Batch 

Icons will only appear if a tea recipe is selected from the Recipe Library.

E. RECIPE LIBRARY

 

Select the button to choose between any of the saved recipes stored in programming.

S

M

L

BREW

TEA

BREW

REGULAR COFFEE

S

M

L

Home Screen

E

E

B

C

A

A

D

55502

 000000

Summary of Contents for ITCB DV

Page 1: ...55502 0000A 06 18 2018 Bunn O Matic Corporation To ensure you have the latest revision of the Operating Manual Illustrated Parts Catalog Programming Manual or Service Manual please visit the Bunn O M...

Page 2: ...y such individuals whether oral or written do not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that the equipment does not conform to the warranty BUNN...

Page 3: ...mes bypass percentages pulse brew dilution etc This allows the operator to program a certain recipe for each coffee or tea flavor to be brewed The Infusion Series Coffee and Tea Brewer is able to brew...

Page 4: ...rvice areas permitted by Authorized Service personnel only Operator NOTICES Carefully read and follow all notices in this manual and on the equipment All labels on the equipment should be kept in good...

Page 5: ...be hooked up later be sure the brewer is disconnected from the power source If plumb ing has been hooked up the brewer is ready for Initial Set Up ELECTRICAL REQUIREMENTS ITCB DV DUAL VOLT TOGGLE SWIT...

Page 6: ...this equipment REQUIRED 1 25 gpm 4 73 lpm flow rate from water supply line NOTE Bunn O Matic recommends 3 8 copper tubing for all installations from the 1 2 water supply line A tight coil of tubing in...

Page 7: ...87 8 87 2 86 7 86 1 85 6 35665 0000A 05 04 2004 Bunn O Matic Corporation 213 8 212 9 212 0 211 1 210 2 209 3 208 4 207 4 206 5 205 6 204 7 203 8 202 9 201 9 201 0 200 1 199 2 198 3 197 4 196 5 195 5...

Page 8: ...ting a Smart Funnel onto the funnel rails the brewer will automatically add the coffee name if it doesn t exist in programming In this event the display will prompt the operator to verify that the rec...

Page 9: ...nd by pass outlet fitting Rotate several times to remove any mineral deposits from the fitting 4 Prepare a warm soapy solution with nonabrasive liquid detergent 140 F Then use a clean damp cloth wette...

Page 10: ...logo for 2 seconds to enter the programming C BATCH SELECTOR SWITCHES Coffee Batch Icons Selecting the icon corresponding to Small Medium and Large batch selects the amount of product to be brewed on...

Page 11: ...ode the display will automatically return to the home screen SERVICE ACCESS To access this menu touch the BUNN logo for 2 seconds with the home screen present This is the first screen that will appear...

Page 12: ...selecting ENTER By default entering 7738 on this screen will allow permission for setting a password Setting a password will prevent entry into the Service Menu SERVICE MENU To access this menu select...

Page 13: ...ng out of the bypass The procedure includes a 1 minute dispense of hot water to determine the actual flow rate Ensure that the brewer is heated to brewing temperature before performing a bypass calibr...

Page 14: ...IT screen will appear on the display If necessary use the scroll arrow at the top of the screen to navigate to the desired recipe name to edit Select the recipe name NOTE Blue filled buttons represent...

Page 15: ...e recipe parameter screen BYPASS ITCB HV Only This icon adjusts the bypass as a percentage of the total brew volume This means the set percentage will bypass the coffee grounds through the funnel to t...

Page 16: ...ing the routine the total brew time will change to be shorter or longer depending on the routine settings Longer pause times extend total brew time in most cases The Auto calculate button will automat...

Page 17: ...e that the tank attempts to heat to and maintain and at what threshold the system allows brewing to occur if brew lockout is on The tank set temp is the set point that the heater tries to control to a...

Page 18: ...be taken directly to the set up screens BREW SETTINGS Users can press the temp set temperature number to go to a keypad entry screen to change the value The ready temperature will work similarly but c...

Page 19: ...Page 19...

Reviews: