![Bunn Infusion Series Installation & Operating Manual Download Page 8](http://html.mh-extra.com/html/bunn/infusion-series/infusion-series_installation-and-operating-manual_2830988008.webp)
Page 8
INITIAL SET-UP
1. Insert an empty funnel into the funnel rails of the brew
station.
2. Place an empty server under the funnel.
3. Connect the brewer to the power source. Make sure the
"ENABLE BREW ON/OFF" switch is ON (LED will be lit).
4. Water will flow into the tank and stop when the tank is
filled to its capacity. Display will show PLEASE WAIT...
TANK FILLING until tank is filled with water.
5. Wait approximately twenty-five minutes for the water in
the tank to heat to the proper temperature. Display will
show READY TO BREW...WATER TEMP: 200° when
tank is at operating temperature. Some water may drip
from the funnel during this time; this is due to expansion
and should not occur thereafter.
6. Water volumes and flow settings have been preset at
the factory. Refer to programming manual should the
volume need to be increased or decreased.
7. The brewer is now ready for use in accordance with the
instructions for Coffee Brewing.
Brew water temperature is factory set at 200° F (93.3°C)
Areas of high altitude will require lowering this tempera-
ture to prevent boiling. This chart should be used as a
guide when readjusting the brew water temperature.
NOTICE
Altitude
(Feet)
101.0
100.5
100.0
99.5
99.0
98.5
98.0
97.4
96.9
96.4
95.9
95.4
94.9
94.4
93.9
93.4
92.9
92.4
91.9
91.4
90.8
90.3
89.8
200
200
200
200
200
200
200
200
199
198
197
196
195
195
194
193
192
191
190
189
188
187
186
93.3
93.3
93.3
93.3
93.3
93.3
93.3
93.3
92.8
92.2
91.7
91.1
90.6
90.6
90.0
89.4
88.9
88.3
87.8
87.2
86.7
86.1
85.6
35665.0000A 05/04 © 2004 Bunn-O-Matic Corporation
213.8
212.9
212.0
211.1
210.2
209.3
208.4
207.4
206.5
205.6
204.7
203.8
202.9
201.9
201.0
200.1
199.2
198.3
197.4
196.5
195.5
194.6
193.7
-1000
-500
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
7500
8000
8500
9000
9500
10000
Boiling point
of water
°F °C
Recommended
water temperature
°F °C
COFFEE BREWING
1. Begin each brew cycle with a clean empty brew funnel.
2. Insert a BUNN filter into the funnel.
3. Pour the fresh coffee into the filter and level the bed of grounds by gently shaking.
4. Slide the funnel into the funnel rails until it stops.
5. Place an empty server under the funnel.
6. The "ENABLE BREW ON/OFF" switch must be ON. Select the desired batch size.
7. Momentarily press and release the assigned BREW button. There may be certain situations in which the brew
cycle will not begin when BREW is pressed:
a. SWITCH NOT ON - "ENABLE BREW ON/OFF" switch must be ON.
b. BREW TEMPERATURE TOO LOW - wait until heated, or cancel BREW LOCKOUT option.
c. DISABLED - select different brew button or batch size.
8. If none of the above messages are displayed, the display will read NOW BREWING and show the time remain-
ing in the brew cycle.
9. Following the brew will be a countdown of drip time DRIPPING which shows the time remaining until the
coffee no longer drips from the funnel tip.
10. Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops.
48497.2 111017