Page 6
39130.1 060810
-1000
213.8
101.0
200
93.3
-500
212.9
100.5
200
93.3
0
212.0
100.0
200
93.3
500
211.1
99.5
200
93.3
1000
210.2
99.0
200
93.3
1500
209.3
98.5
200
93.3
2000
208.4
98.0
200
93.3
2500
207.4
97.4
200
93.3
3000
206.5
96.9
199
92.8
3500
205.6
96.4
198
92.2
4000
204.7
95.9
197
91.7
4500
203.8
95.4
196
91.1
5000
202.9
94.9
195
90.6
5500
201.9
94.4
195
90.6
6000
201.0
93.9
194
90.0
6500
200.1
93.4
193
89.4
7000
199.2
92.9
192
88.9
7500
198.3
92.4
191
88.3
8000
197.4
91.9
190
87.8
8500
196.5
91.4
189
87.2
9000
195.5
90.8
188
86.7
9500
194.6
90.3
187
86.1
10000
193.7
89.8
186
85.6
Brew water temperature is factory set at 200
o
F (93.3
o
C)
Areas of high altitude will require lowering this tempera-
ture to prevent boiling. This chart should be used as a
guide when readjusting the brew water temperature.
Altitude
(Feet)
Boiling point
of water
o
F
o
C
Recommended
water temperature
o
F
o
C
1.
Flush the water line and securely attach it to the inlet fi tting at the rear of the brewer.
2.
Turn on the water supply.
PLUMBING REQUIREMENTS
These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi
(138 and 620 kPa) from a
1
⁄
2
" or larger supply line. A shut-off valve should be installed in the line before the
brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345
kPa). The water inlet fi tting is
1
⁄
4
" fl are.
NOTE -
Bunn-O-Matic recommends
1
⁄
4
" copper tubing for installations of less than 25 feet and
3
⁄
8
" for more than 25
feet from the
1
⁄
2
" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer
to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water fl ow.
1.
Insert an empty funnel into the funnel rails.
2.
Place an empty server under the funnel.
3.
Connect the brewer to the power source.
4.
Turn on the main ON/OFF switch located on the left side
of brewer (If equipped).
5.
Water will fl ow into the tank and stop when the tank is
fi lled to its capacity. Display will show "
PLEASE WAIT...
TANK FILLING"
until tank is fi lled with water.
6.
Wait approximately twenty minutes for the water in the
tank to heat to the proper temperature. Display will show
"
READY TO BREW...WATER TEMP: 200°"
when tank
is at operating temperature. Some water will drip from
the funnel during this time; this is due to expansion and
should not occur thereafter.
7. Place a small container beneath the faucet and open
the faucet handle. Release it when you hear the tank
refi lling.
8.
Water volumes and fl ow settings have been preset at the
factory. Refer to adjustments for the Set Brew Volumes
section of this manual should the volume need to be
increased or decreased.
9.
The brewer is now ready for use in accordance with the
instructions for Coffee Brewing.
10. Repeat steps 5-9 for remaining side on Twins.
INITIAL SET-UP
As directed in the International Plumbing Code of the International Code Council and the Food Code Manual
of the Food and Drug Administration (FDA), this equipment must be installed with adequate backfl ow pre-
vention to comply with federal, state and local codes. For models installed outside the U.S.A., you must
comply with the applicable Plumbing /Sanitation Code for your area.
If setting up new brewer in high mineral
locations, refer to programming (Enable
Brew Logic). Pertains to units with
software version 1.06 & up.