
P3
P3
P3
OD0821 ROCKfrog
© 2 0 2 1
K U R T B E I E R & K A T I Q U I N G E R
L
L
L
L
L
L
L
Assembly for made-to-measure products! Rope installation, runners:
L
Bore (k) for
bolt (U1)
Bore (m), (in case of
made-to-measureproducts)
for bolts (U1)
2.
Screw another bolt (U1) into the middle
position (P3).
3.
Carry out steps 1 and 2 on both runners front
and back in the same way.
In doing so, please note that the positions (P3) always
have to be the same for all 4 points.
Attention! If you should adjust the position, you will have to
adapt this for all 4 points.
1.
Lay the rope (C) with the
loop along the runner up to
the bore (P3) and fasten the
rope with a bolt (U1) by screwing
the bolt (U1) into the outermost
bore (k) (fig. back right).
4.
4. Now,
screw the domed
cap nut (U2) from
the inside tightly
onto the bolts on all 8
positions.
k
m
m
m
m
m
k
P1
P2
P3
P3
P4
P5
U1
U1
C
U2
U2
U2
U1
U1
U1
2
3
5
4
U1
L
One bolt each (U1) is always
screwed in at the outward
positions (L) of the runners and used
(irrespective of the ceiling height).
1
P3
Ceiling height for made-to-measure products.
Runner
Runner
Runner