P1
P1
P1
OD0821 ROCKfrog
© 2 0 2 1
K U R T B E I E R & K A T I Q U I N G E R
P1
Ceiling height 250 cm
U1
L
L
L
L
L
L
L
P2
Ceiling height 245 cm
P3
Ceiling height 240 cm
P4
Ceiling height 235 cm
P5
Ceiling height 230 cm
L
Example, rope installation, runners. Example: ceiling height 250 cm:
L
Bore (k) for
bolt (U1)
Bore (m),
(here ceiling height 250 cm)
for bolt (U1)
One bolt each
(U1)
is always
screwed in at the outward
positions (L) of the runners and used
(irrespective of the ceiling height).
2.
Screw another bolt (U1) into the position
(P1-P5) defined by you.
(example here: position P1, ceiling height 250 cm).
3.
Carry out steps 1 and 2 on both runners front
and back in the same way.
In doing so, please note that the positions (P1-P5) of the
ceiling height always have to be the same.
1.
Depending on the ceiling
height, lay the rope (C) with the
loop along the runner up to the
bore (P1-P5) and fasten the rope
with a bolt (U1) by screwing the
bolt (U1) into the outermost bore (k)
(fig. back right).
4.
Now, screw
the domed cap nut
(U2) from the inside
tightly onto the bolts.
k
m
m
m
m
m
k
P1
P2
P3
P4
P5
Runner
Runner
Runner
U1
U1
C
U2
U2
U1
U1
1
2
3
5
4
L
L