To ensure correct operation, centralized equipment located within the building mechanical 
room is automatically controlled to provide each heat pump unit with water that is at the 
appropriate temperature and flow rate. 
 
 
The unit circuit board incorporates six relay outputs with the following functions: 

 

K1 – Auxiliary relay for cooling valve on a two-valve unit or heat valve on a dehumidification 

               unit. 

 

K2 – Heating Relay  

 

K3 – Alarm Relay 

 

K4 – Compressor Relay 

 

K5 – Low Fan  

 

K6 – High Fan 

Each  of  these  relays  have,  in  parallel,  a  green  LED  indicator  that  lights  up  when  the  relay  is 
energized. 

 

The circuit board incorporates digital inputs that are opto-coupled to a 24V AC source. These have 
amber LED indicators located near the input locations which are lit when the input is closed.  The 
inputs include: 

 

High Pressure Switch 

 

Low Pressure Switch  

 

Heat Call (W on thermostat terminal) 

 

Cool Call (Y on thermostat terminal) 

 

Fan Call (G on thermostat terminal) 

 

Auxiliary (A on thermostat terminal) 

 

Compressor shutdown (24V AC signal thru O/O). Providing a continuous 24V potential to 
O/O will terminate and prevent compressor operation. This can be used for duty-cycling, 
minimizing power consumption during an emergency power period or during sufficiently 
low outdoor air temperatures which allow for free cooling – all while maintaining the 
heating function. 

 

Unit shutdown (24V AC signal thru A/O). Providing a continuous 24V AC potential to A/O 
will terminate and prevent unit operation. This can be used for a night shutdown. On both 
arrangements a single 24V AC signal can shutdown many units. ¼ VA is required per unit.  

 

Finally, the board has four analog inputs provided via thermistors. These inputs are as follows: 

 

Ta – Discharge Air Temperature 

 

Tr – Refrigerant Temperature 

 

Tw – Outgoing Water Temperature 

 

Co – Condensate Level 

 

Summary of Contents for SKC008

Page 1: ...llation Operation Maintenance Manual is Subject to Change without Notice Last Revised Oct 25 2013 Installation Operation Maintenance SpaceKeeper Console BULLDOG Heat Pump SpaceKeeper Console Models SK...

Page 2: ...nts INFORMATION 3 HANDLING 3 STORAGE 3 WEIGHT DIMENSIONS CLEARANCE 4 INSTALLATION 5 DELIVERY AND GENERAL INSTALLATION CHECKLIST 5 ELECTRICAL WIRING 11 OPERATION 12 CAUTION 12 FAN OPERATION 14 HEATING...

Page 3: ...on corrosive environment sheltered from conditions of extreme temperature or humidity Subjecting the unit to conditions of this nature may result in significantly reduced performance reliability and o...

Page 4: ...012 015 018 R410A Charge oz 27 27 30 35 45 Weight Dimensions Clearances Weight Dimensions Model 008 010 012 015 Weight lb 160 160 165 175 Dimensions W X H X D 48 X 25 8 1 X 12 8 3 Dimensions with sta...

Page 5: ...F 29 C to 120 F 49 C Installation Procedure 1 This heat pump unit is to be installed within an indoor environment Locate the unit in an area where the surrounding air temperature is above 45 F 7 C at...

Page 6: ...he black mounting base with the front panel removed 10 With the front panel cover removed locate the three fluid hoses that are attached to the unit s supply return and condensate connections Carefull...

Page 7: ...nce Manual 7 Copyright 2013 CGC Group Inc Installation Operation Maintenance Manual is Subject to Change without Notice Last Revised Nov 15 2019 15 Re attach the heat pump unit s cabinet cover and fro...

Page 8: ...Console SKC Installation Operation Maintenance Manual 8 INSTALLATION Copyright 2013 CGC Group Inc Installation Operation Maintenance Manual is Subject to Change without Notice Last Revised Nov 15 201...

Page 9: ...ceKeeper Console SKC Installation Operation Maintenance Manual Copyright 2013 CGC Group Inc Installation Operation Maintenance Manual is Subject to Change without Notice Last Revised Nov 15 2019 Drawi...

Page 10: ...aceKeeper Console SKC Installation Operation Maintenance Manual Copyright 2013 CGC Group Inc Installation Operation Maintenance Manual is Subject to Change without Notice Last Revised Nov 15 2019 Draw...

Page 11: ...ctrical box and receptacle supplied by others to be mounted and wired to the Piping and Receptacle Plate if supplied or mounted within reach of the console unit s power cord Receptacles required to ma...

Page 12: ...extensive unit clean up and void warranty do not operate units without air filters in place and do not operate units during the construction process The BULLDOG Heat Pump provides year round cooling...

Page 13: ...cators located near the input locations which are lit when the input is closed The inputs include High Pressure Switch Low Pressure Switch Heat Call W on thermostat terminal Cool Call Y on thermostat...

Page 14: ...ted LED indicators HEATING OPERATION 1 A call on W for heat will activate the fan at low speed It will also simultaneously energize the heat relay K2 and its associated LED The relay K2 will provide 2...

Page 15: ...algorithm b If the suction pressure drops below the set point of the low pressure switch the switch will open and if it remains open beyond the 5 minute ignore period after start up compressor operat...

Page 16: ...ture drops below 40 F compressor operation will be disabled After 10 minutes an auto reset occurs and the compressor will be enabled as soon as the temperature rises above 55 F The discharge air tempe...

Page 17: ...ERMOSTAT CONNECTIONS The CGC control board has been designed to operate with most standard 24V AC thermostats These are powered from the CGC board with 24V AC and simply switch power ON to each of the...

Page 18: ...b Global night setback c Heating only mode during emergency power periods The CGC controller is also set up so these shutdown functions can be initiated individually with on board 24V power This capab...

Page 19: ...extend the life of the hoses heat exchangers and other water side accessories Water Flow Rate Open all isolation valves to the unit Ensure that the entering and leaving fluid temperatures of the BULLD...

Page 20: ...areas around the electrical wiring and the circuit board Do not adjust or remove any board connections or wiring connections to other components without first powering down the unit Disconnects are u...

Page 21: ...attention to hose assemblies Note any signs of deterioration or cracking and repair leaks immediately Amperage Check on compressor and fan motor Current draw on this equipment should not exceed norma...

Page 22: ...er Console SKC Installation Operation Maintenance Manual Copyright 2013 CGC Group Inc Installation Operation Maintenance Manual is Subject to Change without Notice Last Revised Nov 15 2019 STANDARD WI...

Page 23: ...ght 2013 CGC Group Inc Installation Operation Maintenance Manual is Subject to Change without Notice Last Revised Nov 15 2019 DETAILS Dimensional Diagram Piping and Receptacle Plate Note The fresh air...

Page 24: ...llation Operation Maintenance Manual Copyright 2013 CGC Group Inc Installation Operation Maintenance Manual is Subject to Change without Notice Last Revised Nov 15 2019 SpaceKeeper Console Hose Assemb...

Reviews: