Chapter 5: Advanced Serverboard Setup
5-3
5-3 Connecting
Cables
Now that the serverboard is installed, the next step is to connect the cables to the
board. These include the data cables for the peripherals and control panel and the
power cables.
Connecting Data Cables
The cables used to transfer data from the peripheral devices have been carefully
routed to prevent them from blocking the fl ow of cooling air that moves through
the system from front to back. If you need to disconnect any of these cables, you
should take care to keep them routed as they were originally after reconnecting
them (make sure the red wires connect to the pin 1 locations). The following data
cables (with their locations noted) should be connected. (See the layout on page
5-10 for connector locations.)
SATA drive data cables (I-SATA0 ~ I-SATA5)
Control Panel cable (JF1)
DVD-ROM drive cable (IDE#1)
USB cable (USB2/3)
COM Port cable (COM2)
Important!
Make sure the the cables do not come into contact with the fans.
Connecting Power Cables
The NovaScale R423 serverboard has a 24-pin primary power supply connector
(JPW1) for connection to the ATX power supply. In addition, there is a 4-pin sec-
ondary power connector (JPW2) as well as an 8-pin processor power connector
(JPW3) that must be connected to your power supply. See Section 5-9 for power
connector pin defi nitions.
Connecting the Control Panel
JF1 contains header pins for various front control panel connectors. See Figure 5-1
for the pin locations of the various front control panel buttons and LED indicators.
All JF1 wires have been bundled into a single cable to simplify this connection. Make
sure the red wire plugs into pin 1 as marked on the board. The other end connects
to the Control Panel PCB board, located just behind the system status LEDs on
the chassis. See Chapter 5 for details and pin descriptions.
•
•
•
•
•
Summary of Contents for NovaScale R423
Page 1: ...NovaScale R423 Installation and User s Guide NOVASCALE REFERENCE 86 A1 95EW 00...
Page 2: ......
Page 10: ...Notes viii NovaScale R423 Installation and User s Guide...
Page 16: ...1 6 NovaScale R423 Installation and User s Guide...
Page 21: ...Chapter 2 Server Installation 2 5 Figure 2 1 Installing Chassis Rails...
Page 23: ...Chapter 2 Server Installation 2 7 Figure 2 2 Installing the Server into a Rack...
Page 25: ...Chapter 2 Server Installation 2 9 Figure 2 3 Accessing the Inside of the System...
Page 30: ...NovaScale R423 Installation and User s Guide 3 4 Notes...
Page 60: ...5 26 NovaScale R423 Installation and User s Guide Notes...
Page 100: ...A 6 NovaScale R423 Installation and User s Guide Notes...
Page 106: ...B 6 NovaScale R423 Installation and User s Guide Notes...
Page 140: ...E 4 NovaScale R423 Installation and User s Guide Notes...
Page 143: ......
Page 144: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 95EW 00...