Bukh DV36 RME Owner'S Handbook Manual Download Page 8

OPERATING MANUAL FOR BUKH DV36RME LIFEBOAT ENGINES 

009W4326-R08 

- 8 - 

 
Frost precautions 

As protection against corrosion and to secure the cooling water freezing temperature to min. minus 15° Celsius as per 
IMO/SOLAS requirement or lower if required from climate conditions, It is recommended to use a mixture of 

min. 30% 

antifreeze liquid and 70% water

 and 

max. 50% antifreeze and 50% water.

 

 
However 

please also note when doing service on lifeboats

 that the mix of water and antifreeze can get aggressive and 

start corrosion. If corrosion is found in the cooling system it can be caused by one of two conditions: 

1.  The anti corrosion additives in the anti freezing liquid are exhausted and have evaporated.  
2.  Oxidation due to incoming air causing an acid which is lowering the PH value.  

Therefore and also to keep the anti freezing properties it is recommended to 

change the cooling water and antifreeze 

every 3 years min.

 Please also note the details provided by your supplier of antifreeze liquid normally stated on the can. 

 
Electrical System 

The engine is equipped with a 12 volt electrical system consisting of a starter motor and an alternator, the max. charging 
current of which is 50 Amp. 
Electrical wiring diagram for the engine with control and instrument panels is shown later in this instruction. 
The battery must never be isolated from the alternator, when the engine is running. 

Warning! It is not allowed to connect additional equipment to the wiring system on the engine. Possible additional 
equipment has to be connected directly to the terminals of the battery. 
 
NOTE! 

The starter must not be operated for more than 10 sec. If further operation is necessary, a pause of at least half a minute 
before starting attempt is repeated. 

 
Marine Gear 

The engine is equipped with a reverse-reduction gear. The standard reduction is 2.94:1 for 
AHEAD and 1.95:1 for REVERSE (but also available as 2.63:1 for special purposes). 
The marine gear will need no other attendance than regular change of oil. This to be carried 
out after 25 hours of operation, and then every 250 hours or once a year. 
Oil  quality:  "Automatic Transmission Fluid” (ATF). 
The oil change is carried out by means of the lubricating oil bilge pump fitted on the engine. 
The oil should be warm when draining. 
Refill new oil to the quantity of 0.5 liters through the dipstick hole. 
Check oil level on the dipstick. 
Don’t forget to close the cock before starting up. 
 
 

 
Starting instructions for BUKH Diesel Engine type DV36RME 

 

Electric start: 
1.  Switch on the main switch. 
2.  Put the gear in neutral position 
3.  Put the switch into ”RUN” position 
4.  Push the ”START” button until the engine starts 

 

Cold Start (below minus 15

o

C if mounted): 

Start pilot: Pull and push the pump (2) 2-3 times. 

 

Stopping the engine: Push the ”STOP” button until the 
engine stops. 

 

After the engine has stopped:Put the switch in ”OFF” 
position. 

 

Filling the pressure tank (3) (if mounted): 
1.  Open the cover. 
2.  Put the gas cylinder on top of the valve and fill up the 

tank to max. marking. 

 

Hand Start: (If mounted): 
Put gear into neutral position. 
Put handle into crank claw. 
Lift decompression lever (1). 

 

Cold start with hand start (below 0

o

C). 

Start pilot: Pos 1 – 2 - 3 
Pull and push the pump (2) 2-3 times. 
Turn the start handle as quickly as possible (clockwise), release the decompression lever, but keep on turning until the 
engine starts. 

 

 

Summary of Contents for DV36 RME

Page 1: ...009W4326 R08 OWNER S HANDBOOK FOR BUKH MARINE DIESEL LIFEBOAT ENGINE TYPE DV36 RME BUKH A S Aabenraavej 13 17 DK 6340 Krusaa Tel 45 74 62 20 88 Fax 45 74 62 74 07 E mail bukh bukh dk www bukh dk...

Page 2: ...of oil 7 Recommended lubricating oil 7 Change of lubricating oil filter 7 Cooling water system 7 Frost precautions 8 Electrical system 8 Marine gear 8 Starting instructions 8 Winter storage of the eng...

Page 3: ...rsible engine mountings 17 Lubricating oil filter 18 Dipstick for engine oil 19 Fuel pump 20 Control lever 21 Cock 22 Reverse reduction gear 23 Cooling water circulating pump 24 Exhaust pipe connectio...

Page 4: ...without previous notice Read this instruction book thoroughly before starting your new BUKH Diesel Engine STANDARD EQUIPMENT for DV36RME Reverse reduction gear Wet sump lubrication oil system Full fl...

Page 5: ...y the starter motor until fuel free from bubbles runs out from the fuel pressure pipes Finally tighten the pipes and the engine fuel system is ready for use This procedure must also be followed if the...

Page 6: ...e Stop button or pull the mechanical stop handle until engine stops 4 Move the Off Run switch to the Off position 5 Turn off the battery main switch Running in To secure long life and maximum power it...

Page 7: ...arious conditions Therefore use a first class HD oil from a recognized oil company Oil specifications as mentioned in LUBRICATION OIL CHART When operating under difficult conditions i e frequent cold...

Page 8: ...attery NOTE The starter must not be operated for more than 10 sec If further operation is necessary a pause of at least half a minute before starting attempt is repeated Marine Gear The engine is equi...

Page 9: ...y in a dry place during the winter 4A For freshwater cooled engines Drain the freshwater from the engine by removing the plugs as indicated for seawater cooled engines It is not necessary to flush thi...

Page 10: ...oil Consequently the oil will get too warm and foam and bleeding will be inadequate Oil vapour will condense and in extreme cases run out of the suction filter Do NOT fill the engine with more oil tha...

Page 11: ...aring housing Checking of oil level Dismount the filling plug with dipstick when the spray pump is in a horizontal position The oil level must be just above the lower edge of the shaft When turning th...

Page 12: ...TIMING AUTOMATIC VARIABLE FUEL LIFT PUMP CAM SHAFT DRIVEN DIAPHRAGM PUMP STATIC PRESSURE OF FUEL LIFT PUMP 153 285 mBar FUEL FILTER THROW AWAY FILTER INSERT FUEL QUALITY GAS OIL BS 2869 CLASS A LUBRI...

Page 13: ...X 4 Check of fuel system 4 1 supply line clean water fuel separator and check line bends repair if damaged or renew X 4 2 fuel tank drain for water X 4 3 fuel filter change X 4 4 return line check fo...

Page 14: ...RPM adjust RPM X 9 4 Full speed loaded with propeller and spray pump 2800 3600 RPM adjust RPM X 9 5 Cooling water temp to be max 95 degr Celcius max 95 C change termostat X 9 6 Audible and visual alar...

Page 15: ...r incorrectly adjusted or something in the system works sluggishly Adjust the governor Check governor system and correct the error Hot engine smell of heat Insufficient cooling water supply Stop engin...

Page 16: ...SAE 15W 40 API CG 4 FZG11 EXXON ESSO SPARTAN EP220 ISO VG 220 X EXXON ESSO GEAROIL GX SAE 80W 90 X MOBIL OIL MOBIL 1 0W 40 SAE 0W 40 API SJ CF EC X X X X MOBIL OIL MOBIL Delvac 1 SHC SAE 5W 40 API CE...

Page 17: ...OPERATING MANUAL FOR BUKH DV36RME LIFEBOAT ENGINES 009W4326 R08 17...

Page 18: ...OPERATING MANUAL FOR BUKH DV36RME LIFEBOAT ENGINES 009W4326 R08 18...

Page 19: ...OPERATING MANUAL FOR BUKH DV36RME LIFEBOAT ENGINES 009W4326 R08 19 Installation DV36...

Page 20: ...in Company Ltd Qinhuangdao Office No 1 11 Nongken Building Shanhaiguan Development Zone Hebai CHINA 066206 Tel 86 335 5082 500 Fax 86 335 5085 036 E mail forwin heinfo net For Win Equipment Engineerin...

Page 21: ...anvier Passero 06210 Mandelieu FRANCE Tel 33 4 92 19 50 89 Fax 33 4 93 47 65 11 E mail diams020 aol com Contact Raymond Allo Bukh Bremen GmbH Kornstrasse 243 28201 Bremen GERMANY Tel 49 421 535070 Fax...

Page 22: ...The Engine Room Limited 34 Enterprise Street P O Box 34 0132 North Shore City 0746 Auckland NEW ZEALAND Tel 64 9 480 2248 Fax 64 9 480 2258 E mail theengineroom xtra co nz Website www theengineroom c...

Page 23: ...n Machinery Co Ltd 777 Mahachai Road Wangburapapirom Pranakorn Bangkok 10200 THAILAND Tel 66 2 6211000 Fax 66 2 6211049 2252877 E mail tawee minsen co th Website www minsen co th Contact Tawee Techato...

Page 24: ...ected later than the stipulated settling date interest shall be paid on overdue payments at the rate of 1 5 per cent per month or fraction of a month Bukh A S reserves the right to change the rate of...

Reviews: