SECTION 2 - OPERATION
2-141
Float (Mechanical)
To put the lift links into mechanical float position,
remove the pin, 1, securing the lower link to the
hole on the lift link. Reconnect the lower link to
the lift link using the slot on the lift link. Reverse
this procedure to convert to non-float position.
When in this position, the hitch will float
approximately 76mm (3
″
) when fully lowered.
NOTE: Full float position is achieved by
adjusting the hitch position knob on the side
console to its float detent position when in
the automatic mode.
Figure 2-196
1
Sway Blocks
Sway blocks, 1, have two positions for use with
the 3-point hitch. When the blocks are in the
sway position, the lower links can move side to
side approximately 51mm (2
″
). When in the
non-sway position, the lift arms will be limited in
their side-to-side movement when hooked to an
implement.
Figure 2-197
1
When the sway blocks, 1, are in the sway
position, the block is rotated so that the narrow
end of the block is downward.
Figure 2-198
1
Summary of Contents for Versatile 2290
Page 1: ......
Page 20: ...0 18 ...
Page 58: ...SECTION 1 GENERAL INFORMATION 1 38 ...
Page 66: ......
Page 160: ......
Page 162: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 182: ......
Page 183: ...SECTION 2 OPERATION 2 125 Figure 2 163 ...
Page 232: ...SECTION 3 LUBRICATION AND MAINTENANCE 3 7 BLANK PAGE ...
Page 233: ......
Page 234: ......
Page 236: ......
Page 266: ......
Page 274: ......
Page 316: ...SECTION 4 TROUBLESHOOTING 4 2 BLANK PAGE ...
Page 330: ...SECTION 4 TROUBLESHOOTING 4 16 BLANK PAGE ...
Page 363: ...SECTION 5 SPECIFICATIONS 5 33 BLANK PAGE ...
Page 370: ...5 40 ...
Page 372: ...5 42 ...
Page 380: ......