![Buhler Inland 1500 Operator And Parts Manual Download Page 13](http://html1.mh-extra.com/html/buhler/inland-1500/inland-1500_operator-and-parts-manual_2827962013.webp)
bühler
1500 Bale Carrier
11
The power required to operate the 1500 Bale Carrier is supplied by the tractors
12-volt electrical system. Connect the red wire to the tractor positive and green to
tractor ground. Connection may be made via tractor accessory plug or alternate
method. The 15-amp fuse must be used on the positive wire as supplied.
Verify 1500 Bale Carrier operation matches 1500 Bale Carrier control handle
decal.
Summary of Contents for Inland 1500
Page 31: ...b hler 1500 Bale Carrier 29 NOTE PAGE...
Page 53: ...b hler 1500 Bale Carrier 51 Open Center Valve Part A7016 00 Open Center Configuration...
Page 55: ...b hler 1500 Bale Carrier 53 1500 Bale Carrier Hydraulic Schematic...
Page 56: ...b hler 1500 Bale Carrier 54 NOTES PAGE...
Page 60: ...b hler 1500 Bale Carrier 58 NOTES PAGE...
Page 76: ...b hler 1500 Bale Carrier 74 Bale Deflector Assembly RH Part A2400 16 Optional...