Installation and servicing instructions for wall-mounted condensing gas boiler Buderus 600 - 11R/19R/24R • 02/2006
Buderus • http://www.buderus-domestic.co.uk
Subject to modifications resulting from technical improvements!
Reports
8
8.2
Inspection and maintenance reports
Please check off the inspection and/or requirement-
related maintenance tasks carried out and enter the
corresponding readings.
The inspection and maintenance reports provide an
overview of all the tasks and operations carried out.
z
Sign details of inspection and maintenance tasks,
indicating date carried out.
See also Section 3: "Inspection“ on page 40 or
Section 4: "Maintenance“ on page 41.
Use only original replacement parts.
Inspection tasks
Date: _____________
Date: _____________
1. Check general state of system
2. Visual inspection and function check of system
3. Check gas- and water-bearing components for:
- leaks;
- signs of corrosion;
- signs of ageing.
4. Take system out of service and check the burner, heat exchanger
and syphon for signs of dirt and soiling.
(see subsection 4.1.1 on page 41)
5. Check the burner, glow ignitor and ionisation electrode,
after disconnecting the system.
(see subsection 4.1.1 on page 41)
6. Measuring the ionisation current
(see subsection 2.2.10 on page 38)
_________________ µA
_________________ µA
7. Measure the gas connection pressure (working pressure)
(see subsection 2.2.5 on page 34)
________________ mbar
________________ mbar
8. Check the gas-air ratio
(see subsection 2.2.8 on page 37)
_________________ Pa
_________________ Pa
9. Gas leak test in operational condition
(see subsection 2.2.1 on page 31)
10. Measure the carbon monoxide content (CO), vacuum
(see subsection 2.2.9 on page 37)
________________ ppm
________________ ppm
11. Pressure-testing of heating system:
- admission pressure of expansion tank
(see installation instructions supplied with expansion tank)
- Filling pressure
________________ mbar
________________ mbar
________________ mbar
________________ mbar
12. Check ventilation and flue gas conduits for correct functioning and
safety
13. Check requirement-related adjustment settings of control device
(see documentation supplied with control device)
14. Final check of inspection tasks,
with record kept of measurement readings and test results
15. Confirm inspection carried out by qualified service engineer
and fill out the
Benchmark
Company stamp / Date / Signature)