Installation and servicing instructions for wall-mounted condensing gas boiler Buderus 600 - 11R/19R/24R • 02/2006
Buderus • http://www.buderus-domestic.co.uk
Subject to modifications resulting from technical improvements!
Reports
8
8
Reports
8.1
Start-up report
z
Please check off the start-up tasks carried out and
enter the corresponding readings.
Initial start-up tasks
Remarks or measurement readings
1. Type of gas:
Natural gas
LPG
2. Inspect to check for leaks
(see subsection 2.2.1 on page 31)
3. Check combustion air/flue gas connection
(see subsection 2.2.4 on page 33)
4. Checking the boiler equipment (change to another type of gas if
necessary) (see subsection 2.2.4 on page 33)
5. Carry out adjustment settings
(see subsection 2.2.6 on page 35)
6. Measure the gas connection pressure (working pressure)
(see subsection 2.2.5 on page 34)
_____________________ mbar
7. Checking and adjusting the gas/air-ratio
CO
2
-content:
at full load
at part load
(see subsection 2.2.8 on page 37)
_____________________ Pa
_____________________ %
_____________________ %
8. Leak test in operational condition
9. Measure carbon monoxide content (CO), vacuum
(see subsection 2.2.9 on page 37)
_____________________ ppm
10. Function testing
Measuring the ionisation current
(see subsection 2.2.10 on page 38)
_____________________ µA
11. Fit the boiler casing
12. Instruct the user. Fill in Benchmark log book.
Hand over documentation.
(see subsection 2.2.12 on page 39)
13. Confirm initial start-up
Confirmation of initial start-up by qualified service technician
(Company stamp, signature)