5 Putting into operation
47
NIRFlex N-500
Operation Manual, Version G
NOTE
• To cut the power in case of an emergency by unplugging, the instrument or any other item must
not block the mains plug! The plug must be able to be pulled out instantly at all time.
• Additional electrical safety measures such as residual current breakers may be necessary to meet
local laws and regulations!
• External power switches (e.g. emergency stop switches) must meet IEC 60947-1 and IEC
60947-3 requirements. Such devices must be clearly labeled and accessible at any time.
• External connections and extension lines must be provided with a grounded conductor lead
(3-pole couplings, cord or plug equipment). All used power cords must meet the input power
requirements.
5 .4
Installing the instrument
To install the instrument, proceed as follows:
• Connect the NIRFlex N-500 to the PC using the supplied Ethernet cable.
• Connect the mains cable to the socket.
• Switch on the NIRFlex N-500 via the main switch on the rear of the instrument.
• Start the PC, and install the NIRWare software.
• Set up the communication between NIRFlex N-500 and the PC.
5 .4 .1
Setting up the Ethernet communication
The NIRFlex N-500 is equipped with one Ethernet (LAN) socket at the rear side.
LAN
LAN settings of the NIRFlex N-500
The primary network connector
(LAN1)
is predefined for direct communication to a PC.
Standard configuration of the Spectrometer:
• Static IP-address 192.168.1.1
• Subnet mask 255.255.255.0
NOTE
• The default IP-address of the spectrometer can be changed to a customer specific static
IP-address provided by the local IT. This configuration is done within the Service Tools and
described in the NIRWare Online Help and the corresponding PDF-file.
• The spectrometer‘s IP-address can be reset to default (192.168.1.1) by pushing and holding
both, START and STOP button, at the measuring cell during the power-up procedure of the
NIRFlex N-500 for about 50 seconds.