This document is the
Property of Broadband Telecom Power Inc.
and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus without written permission.
BTCPower 200 KW EVSE Installation manual
Rev K
Page 1 of 26
DOCUMENT TITLE
BTC Power EVSE Power Charger
Installation and User Manual
REVISION HISTORY
Rev
Date
ECN #
Description of BTCPower EVSE
ORIGINATOR
A
11/2/2017
1001
Initial Release
Cortes
B
1//12/2017
1002
Added the following:
1. Fiber optic
2. Dispenser auxiliary
3. Interlock specification
4. Installation drawing
5. Air flow clearance requirements
6. Door and cover opening
7. Conduit windows
8. Changed dispenser auxiliary to
120 VAC single phase
Cortes
C
1/29/2017
1003
1. Added three dispenser 50 KW
configuration
Cortes
D
1/30/2018
1004
1. Added 50 KW auxiliary power and
clarified input terminals.
2. Added 50 KW CCS dispenser part
numbers
Cortes
E
2/13/2018
1005
1. Added 50 KW installation method
2. Added fuse information
3. No reverse power flow statement
4. Added connection points for 50 KW
charge dispensers
Nimit Dave
F
2/22/2018
1006
1. Added THD information
2. No reverse power flow information
Cortes
G
3/11/2018
1007
1. Interlock description
2. Short circuit current interrupt model
numbers added
Cortes
H
3/20/2018
1008
1. Added enclosure IK rating
2. Added dispenser lumen rating for
LED lighting
Cortes
I
4/22/2018
1009
1. Added comments on wiring
Cortes