background image

BST Solutions GmbH  |  UV COMPACT FLAME DETECTOR IFC 10 

Page 16

4.4  Dimensions IFC 10

All dimensions in mm

4.5 Installation

The IFC 10 should be mounted close to the flame with straight alignment. The compact flame 
detector should be mounted with the diopter. The diopter guaranties a quick mounting and 
demounting of the compact flame controller. A diameter of 1‘‘ is recommended for viewing 
tube that is cut down on the port side of the rear sight to ½‘‘. The sight pipe must be ade-
quately dimensioned.

The alignment is to concentrate on the primary zone of the flame (flame root). The distance 
from the flame should be less than 2 m. Upon completion of the assembly work the screws 
of the rear sight to the flame menwächters are to be tightened down. At high temperature 
on the sight glass, which could heat the UV tube to about 60°C, an air connection is to be 
provided. To avoid interference, the direct view is to avoid a spark.

The maximum cable length of the cable is to be noted (see „Technical data). The connecting 
cable is to run separately from the high-energy ignition and power lines over long distances 
and not parallel to transfer it to.

All installation and connection work may be carried out by qualified and approved spe-
cialist staff only! The legal regulations as well as adjustment instructions of the plant 
operator have to be observed!

NOTICE

TRANSPORT, INSTALLATION AND CONNECTION

For safety reasons and technical regulations a controlled burner shut down of at least 
once per 24 hours must be guaranteed. Check according to EN 298:2012-11 need to 
check the UV tube to be used in the burner control to the controlled shutdown on the 
presence of a flame signal back.

DANGER

!

Summary of Contents for Flamonitec IFC Series

Page 1: ...Operating manual UV Compact Flame Detector IFC 10...

Page 2: ...undamental aspects 2 5 2 Electrical electronic devices 2 5 3 Testing per German Workplace Safety Ordinance BetrSichV 2 5 4 Safety test 3 Technical data 3 1 General characteristic features 3 2 Electric...

Page 3: ...RMF 1 6 Operation of the compact flame detector IFC 10 6 1 Test of the compact flame detector 6 2 Operating indicator LED 7 Maintenance and servicing 7 1 Cleaning 7 2 Maintenance interval 7 3 Safety r...

Page 4: ...ion troubleshooting during operation servicing maintenance upkeep inspection repair and or transport This should be confirmed by the operating company in writing 1 2 Warning notes The following warnin...

Page 5: ...nstructions carefully and in full before operating the compact flame detektor IFC 10 The manufacturer is not liable for damage or operating malfunctions that result from the operating instructions not...

Page 6: ...compact flame detektor may cause hazards if it is operated inappropriately or in an im proper condition The operating company is under the obligation to operate the machine in proper state only The op...

Page 7: ...lfunctions that result from operating errors inappropriate repairs or the non observance of the operating instructions We expressly state that only original spare parts and accessories approved by us...

Page 8: ...r EU Richtlinien entspricht This is to confirm that the below described system in its design and type of construction complies with the provisions of the Directive of the Council of the European Commu...

Page 9: ...optical interface which visibly indicates the flame signal intensity A simple diagnosis of the flame intensity is directly on the furnace or boiler possible The manufacturer supplier shall not be lia...

Page 10: ...has been fitted with warning and danger signs for the protection of operating staff These signs have to be observed Damaged or illegible signs have to be replaced immediately NOTICE SAFETY Only operat...

Page 11: ...aff under the direction and supervision of an electrical specialist The adjustment maintenance and inspection activities and deadlines stipulated by BST Solutions including information on the replacem...

Page 12: ...s to carry out a precise test prior to start up in accordance with the German Workplace Safety Ordinance BetrSichV in force and the applicable electrical regulations In case of queries please get in t...

Page 13: ...es life of the UV tube Operating position any position Kind of protection IP 65 Protection class I Humidity max 95 r H non condensing Restart time 5s between controlled shutdown and renewed heat reque...

Page 14: ...dth 66 mm Height 92 mm Dimensions see under item 4 4 3 5 Block diagram IFC 10 TECHNICAL DATA Applies for the maximum length of cable By an appropriate size depending on the length of cable is to ensur...

Page 15: ...the insurance company without delay and transmit the full claim documents at once in order to expedite the claims settlement at the latest in suf ficient time before the expiry of any periods of precl...

Page 16: ...wn At high temperature on the sight glass which could heat the UV tube to about 60 C an air connection is to be provided To avoid interference the direct view is to avoid a spark The maximum cable len...

Page 17: ...due to high combustion chamber temperatures above 60 C a purge air connection in order to limit the temperature sensor to provide a maximum of 60 C is essential The dimensioning of the scavenging air...

Page 18: ...g conditions apply to storage Store in a dry place Maximum relative humidity 95 Non condensing In addition it has to be assured that the floor in the storage area will remain dry throughout the storag...

Page 19: ...rmanently energised With the Dioptric holder which serves also as a connection interface of the flame detector to the combustion chamber the IFC 10 can be fitted with different glasses and lenses to s...

Page 20: ...st should be repeat for differnt operation situations see also da tasheet This is a essential condition for a safe and proper operation 6 2 Operating indicator LED Via the built in LED the flame detec...

Page 21: ...ollten folgende Schritte berpr ft werden The attempt to start the burner flame detector is darken after the end of the safety time into lock indicate a fault The attempt to start the burner s flame de...

Page 22: ...Power off the IFC and take it out of the flange Now clean the glass carefully with a clean and lint free cloth Exchange IFC Exchange tube Ambient light interference I Tube faulty II View to sparks Exc...

Page 23: ...ctor UV quartz glass plate nut and gasket 465301120200 Adapter 1 with purge air connector UV quartz glass lense nut and gasket 465301220200 Relay module for flame detectors RMF1 230V 640480002000 Rela...

Page 24: ...BST Solutions GmbH Ruegenstr 7 42579 Heiligenhaus Germany T 49 2056 98947 0 info amonitec bst com www amonitec bst com Subject to technical changes BST Solutions 2021 MEMBER OF MINDERMANN GROUP...

Reviews: