9
ACCESS PANELS MUST BE IN PLACE WHEN RIGGING.
PANNEAUX D'ACCES DOIT ÊTRE EN PLACE POUR MANIPULATION.
50CY502286 2.0
CAUTION - NOTICE TO RIGGERS
PRUDENCE - AVIS AUX MANIPULATEUR
Use top skid as spreader bar. / Utiliser la palette du haut comme barre de répartition
SEAL STRIP MUST BE IN
PLACE BEFORE PLACING
UNIT ON ROOF CURB
DUCTS
DETAIL A
VOIR DÉTAIL A
MINIMUM HEIGHT: 36" (914.4 mm)
HAUTEUR MINIMUM
UNIT HEIGHT
HAUTEUR D'UNITÉ
SEE DETAIL A
VOIR DÉTAIL A
BANDE SCELLANT DOIT ÊTRE
EN PLACE AVANT DE PLACER
L'UNITÉ SUR LA BASE DE TOIT
A09051
Standard Copper Tube Aluminum Fin
SMALL CABINET
LARGE CABINET
Unit
24
30
Unit
36
42
48
60
lb
kg
lb
kg
lb
kg
lb
kg
lb
kg
lb
kg
Rigging Weight
352
160
359
163
Rigging Weight
455
206
455
206
500
227
520
236
NOTE: See dimensional drawing for corner weights.
Optional Copper Tube Copper Fin
SMALL CABINET
LARGE CABINET
Unit
24
30
Unit
36
42
48
60
lb
kg
lb
kg
lb
kg
lb
kg
lb
kg
lb
kg
Rigging Weight
390
177
416
189
Rigging Weight
517
235
517
235
584
265
610
277
NOTE: See dimensional drawing for corner weights.
Fig. 7 -- Suggested Rigging
577E
Summary of Contents for 577E-A
Page 5: ...5 A190127 Fig 3 577E Unit Dimensions 577E ...
Page 6: ...6 A190128 Fig 4 577E 36 60 Unit Dimensions 577E ...
Page 7: ...7 A150039 Fig 5 577E B36 60 Unit Dimensions 577E ...
Page 21: ...21 A14593 Fig 16 208 230 1 60 Connection Wiring Diagram 577E ...
Page 22: ...22 A14594 Fig 17 Cont 208 230 1 60 Ladder Wiring Diagram 577E ...
Page 23: ...23 A14615 Fig 17 208 230 3 60 Connection Wiring Diagram Gas Inputs 40 60 90 KBtu hr 577E ...
Page 24: ...24 A14616 Fig 18 Cont 208 230 3 60 Ladder Wiring Diagram Gas Inputs 40 60 90 KBtu hr 577E ...
Page 25: ...25 A14618 Fig 18 208 230 3 60 Connection Wiring Diagram Gas Inputs 115 130 577E ...
Page 26: ...26 A14617 Fig 19 Cont 208 230 3 60 Ladder Wiring Diagram Gas Inputs 115 130 577E ...
Page 27: ...27 A13026 Fig 19 460 3 60 Connection Wiring Diagram 577E ...
Page 28: ...28 A13027 Fig 20 Cont 460 3 60 Ladder Wiring Diagram 577E ...