12
hood assembly over flue panel. Orient screw holes in flue
hood with holes in the flue panel.
3. Secure flue hood to flue panel by inserting a single screw on
the top flange and the bottom flange of the hood.
Step 8 — Install Gas Piping
The gas supply pipe enters the unit through the access hole
provided. The gas connection to the unit is made to the 1/2--in.
(12.7 mm) FPT gas inlet on the gas valve.
Install a gas supply line that runs to the heating section. Refer to
the NFGC for gas pipe sizing. Do not use cast--iron pipe. It is
recommended that a black iron pipe is used. Check the local utility
for recommendations concerning existing lines. Size gas supply
piping for 0.5 IN. W.C. maximum pressure drop. Never use pipe
smaller than the 1/2--in. (12.7 mm) FPT gas inlet on the unit gas
valve.
For natural gas applications, the gas pressure at unit gas connection
must not be less than 4.0 IN. W.C. or greater than 13 IN. W.C.
while the unit is operating. For propane applications, the gas
pressure must not be less than 11.0 IN. W.C. or greater than 13 IN.
W.C. at the unit connection.
A 1/8--in. (3.2 mm) NPT plugged tapping, accessible for test gauge
connection, must be installed immediately upstream of the gas
supply connection to the gas valve.
When installing the gas supply line, observe local codes pertaining
to gas pipe installations. Refer to the NFPA 54/ANSI Z223.1 latest
edition (in Canada, CAN/CGA B149.1).
NOTE
: In the state of Massachusetts:
1. Gas supply connections MUST be performed by a licensed
plumber or gas fitter.
2. When flexible connectors are used, the maximum length
shall not exceed 36 inches (915 mm).
3. When lever handle type manual equipment shutoff valves
are used, they shall be T--handle valves.
4. The use of copper tubing for gas piping is NOT approved
by the state of Massachusetts.
In the absence of local building codes, adhere to the following
pertinent recommendations:
1. Avoid low spots in long runs of pipe. Grade all pipe 1/4 in.
(6.35 mm) for every 15 ft (4.6 m) of length to prevent traps.
Grade all horizontal runs downward to risers. Use risers to
connect to heating section and to meter.
2. Protect all segments of piping system against physical and
thermal damage. Support all piping with appropriate straps,
hangers, etc. Use a minimum of one hanger every 6 ft (1.8
m). For pipe sizes larger than 1/2 in., follow
recommendations of national codes.
3. Apply joint compound (pipe dope) sparingly and only to
male threads of joint when making pipe connections. Use
only pipe dope that is resistant to action of liquefied
petroleum gases as specified by local and/or national codes.
Never use Teflon tape.
4. Install sediment trap in riser leading to heating section (See
Fig. 9). This drip leg functions as a trap for dirt and
condensate.
5. Install an accessible, external, manual main shutoff valve in
gas supply pipe within 6 ft (1.8 m) of heating section.
6. Install ground--joint union close to heating section between
unit manual shutoff and external manual main shut--off
valve.
7. Pressure test all gas piping in accordance with local and
national plumbing and gas codes before connecting piping
to unit.
OUT
TEE
NIPPLE
CAP
IN
C99020
Fig. 9 -- Sediment Trap
NOTE
: Pressure test the gas supply system after the gas supply
piping is connected to the gas valve. The supply piping must be
disconnected from the gas valve during the testing of the piping
systems when test pressure is in excess of 0.5 psig. Pressure test the
gas supply piping system at pressures equal to or less than 0.5 psig.
The unit heating section must be isolated from the gas piping
system by closing the external main manual shutoff valve and
slightly opening the ground--joint union.
Table 2 – Maximum Gas Flow Capacity*
NOMINAL
IRON PIPE
SIZE (IN.)
INTERNAL
DIAMETER
(IN.)
LENGTH OF PIPE FT (m)†
10
(3)
20
(6)
30
(9)
40
(12)
50
(15)
60
(18)
70
(21)
80
(24)
90
(27)
100
(30)
125
(38)
150
(46)
175
(53)
200
(61)
1/2
.622
175
120
97
82
73
66
61
57
53
50
44
40
—
—
3/4
.824
360
250
200
170
151
138
125
118
110
103
93
84
77
72
1
1.049
680
465
375
320
285
260
240
220
205
195
175
160
145
135
1---1/4
1.380
1400
950
770
600
580
530
490
460
430
400
360
325
300
280
1---1/2
1.610
2100
1460
1180
990
900
810
750
690
650
620
550
500
460
430
*Capacity of pipe in cu ft of gas per hr for gas pressure of 0.5 psig or less. Pressure drop of 0.5---IN. W.C. (based on a 0.60 specific gravity gas). Refer to Table 2
and National Fuel Gas Code NFPA 54/ANSI Z223.1.
{
This length includes an ordinary number of fittings.
577E
Summary of Contents for 577E-A
Page 5: ...5 A190127 Fig 3 577E Unit Dimensions 577E ...
Page 6: ...6 A190128 Fig 4 577E 36 60 Unit Dimensions 577E ...
Page 7: ...7 A150039 Fig 5 577E B36 60 Unit Dimensions 577E ...
Page 21: ...21 A14593 Fig 16 208 230 1 60 Connection Wiring Diagram 577E ...
Page 22: ...22 A14594 Fig 17 Cont 208 230 1 60 Ladder Wiring Diagram 577E ...
Page 23: ...23 A14615 Fig 17 208 230 3 60 Connection Wiring Diagram Gas Inputs 40 60 90 KBtu hr 577E ...
Page 24: ...24 A14616 Fig 18 Cont 208 230 3 60 Ladder Wiring Diagram Gas Inputs 40 60 90 KBtu hr 577E ...
Page 25: ...25 A14618 Fig 18 208 230 3 60 Connection Wiring Diagram Gas Inputs 115 130 577E ...
Page 26: ...26 A14617 Fig 19 Cont 208 230 3 60 Ladder Wiring Diagram Gas Inputs 115 130 577E ...
Page 27: ...27 A13026 Fig 19 460 3 60 Connection Wiring Diagram 577E ...
Page 28: ...28 A13027 Fig 20 Cont 460 3 60 Ladder Wiring Diagram 577E ...