16
unit disconnect. On a unit without a unit--mounted
disconnect, connect the source leads to compressor
contactor C and indoor fan contactor IFC pressure lugs
with unit field power leads.
Field power wires are connected to the unit at line--side
pressure lugs on compressor contactor C and indoor fan
contactor IFC or terminal board (see wiring diagram label
for control box component arrangement) or at
factory--installed option non--fused disconnect switch.
Max wire size is #2 AWG (copper only). (See Fig. 18.)
NOTE
: TEST LEADS -- Unit may be equipped with
short leads (pigtails) on the field line connection points on
contactor C or optional disconnect switch. These leads are
for factory run--test purposes only; remove and discard
before connecting field power wires to unit connection
points. Make field power connections directly to line
connection pressure lugs only.
Units Without Disconnect Option
Units With Disconnect Option
2
4
6
1
3
5
L1
L2
L3
Optional
Disconnect
Switch
Disconnect factory test leads; discard.
Factory
Wiring
11
13
13
L1
L2
L3
TB
C
IFC
(3 Phase
Indoor Motor)
(1 Phase Indoor Motor
and 1 Phase Unit)
208/230-3-60
460-3-60
575-3-60
Disconnect
per
NEC
C10468
Fig. 18 -- Power Wiring Connections
!
WARNING
FIRE HAZARD
Failure to follow this warning could result in
personal injury, death, or property damage.
Do not connect aluminum wire between disconnect
switch and furnace. Use only copper wire.
(See Fig. 19.)
COPPER
WIRE ONLY
ELECTRIC
DI
S
CONNECT
S
WITCH
ALUMINUM
WIRE
A93033
Fig. 19 -- Disconnect Switch and Unit
Units with Factory--Installed Non--Fused Disconnect —
The factory--installed option non--fused disconnect (NFD)
switch is located in a weatherproof enclosure located
under the main control box. The manual switch handle and
shaft are shipped in the disconnect enclosure. Assemble the
shaft and handle to the switch at this point. Discard the
factory test leads (see Fig. 18).
Connect field power supply conductors to LINE side
terminals when the switch enclosure cover is removed to
attach the handle.
C12284
Fig. 20 -- Location of Non--Fused Disconnect Enclosure
To field install the NFD shaft and handle:
1. Remove the unit front panel (see Fig. 2 or Fig. 3).
2. Remove (3) hex screws on the NFD enclosure -- (2) on
the face of the cover and (1) on the left side cover. See
Fig. 21.
3. Remove the front cover of the NFD enclosure.
4. Make sure the NFD shipped from the factory is at
OFF position (the arrow on the black handle knob is
at OFF).
5. Insert the shaft with the cross pin on the top of the shaft
in the horizontal position.
6. Measure from the tip of the shaft to the top surface of
the black pointer; the measurement should be 3.75 to
3.88 in. (95 to 99 mm).
7. Tighten the locking screw to secure the shaft to the
NFD.
8. Turn the handle to the OFF position with red arrow
pointing at OFF.
9. Install the handle on to the painted cover horizontally
with the red arrow pointing to the left.
Summary of Contents for 549J Series
Page 4: ...4 C160144 Fig 2 Unit Dimensional Drawing 07 08 Size Units ...
Page 5: ...5 C160145 Fig 2 Unit Dimensional Drawing 07 08 Size Units cont ...
Page 6: ...6 C10757A Fig 3 Unit Dimensional Drawing 09 Size Units ...
Page 7: ...7 C10758A Fig 3 Unit Dimensional Drawing 09 Size Unit cont ...
Page 40: ...40 a549J 001 Fig 44 Typical RTU Open Controller Wiring Diagram ...