![Bryant 549J Series Installation Instructions Manual Download Page 11](http://html.mh-extra.com/html/bryant/549j-series/549j-series_installation-instructions-manual_2822056011.webp)
11
7/16"
[11]
4 9/16"
[115.5]
1/4"
[7.0]
"A"
1 3/4"
[44.5]
1 3/4"
[44.4]
20-3/4"
[513]
INSIDE
"A"
81 3/4"
[2076.3]
53 1/2"
[1358.9]
1 3/4"
[44.5]
40 3/16"
[1020.8]
2 1/4"
[57.2]
26"
[660.4]
4 3/16"
[106.0]
6 3/64"
[153.5]
32 9/16"
[827.1]
23 1/16"
[585.8]
31 17/32"
[800.9]
1 3/4"
[44.5]
15 13/16"
[401.6]
11.42"
[290.0]
1 3/4"
[44.4]
3"
[76.2]
2-3/8"
[61]
14 3/4"
[374.7]
6' 6-1/4"
[1987.5]
1-3/4"
TYP
[44.5]
4' 2"
[1270.0]
15 15/32
[392.9]
1.00"
[25.4]
CRBTMPWR002A01
3/4" [19] NPT
1 1/4" [31.7] NPT
CRRFCURB004A01
CONNECTOR PKG. ACC.
GAS CONNECTION TYPE
GAS FITTING
POWER WIRING
FITTING
CONTROL WIRING
FITTING
ACCESSORY CONVENIENCE
OUTLET WIRING CONNECTOR
THRU THE CURB
1/2" [12.7] NPT
1
/2" [12.7] NPT
CRBTMPWR004A01
THRU THE BOTTOM
ROOF CURB
ACCESSORY #
A
CRRFCURB003A01
14"
[356]
24"
[610]
ECN NO.
APP'D
CHK'D
BY
DATE
REVISION RECORD
REV
1067898
-
-
MMC
4/22/13
6' 61/4" WAS 6' 7 1/6", 4'2' WAS 4' 2 13/16";
18 GA WAS 16 GA.; 15 13/16" WAS 15 15/16"; NAIL
FIELD SUPPLIED WAS WITH CURB
C
DRAWING RELEASE LEVEL:
PRODUCTION
THIRD ANGLE
PROJECTION
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
TOLERANCES ON:
THIS DOCUMENT AND THE INFORMATION CONTAINED THEREIN
IS PROPRIETARY TO CARRIER CORPORATION AND SHALL NOT
BE USED OR DISCLOSED TO OTHERS, IN WHOLE OR IN PART,
WITHOUT THE WRITTEN AUTHORIZATION OF CARRIER CORPORATION.
1 DEC
2
DEC
3
DEC
A
NG
MATERIAL
---
-
-
-
-
AUTHORIZATION NUMBER
TITLE
1029120
CURB ASY, ROOF
ENGINEERING
M
ANUFACTURING
ENGINEERING REQUIREMENTS
-
-
-
-
SIZE
D
RAWING NUMBER
REV
T-005, Y-002
DRAFTER
CHECKER
D
50HJ405012
C
WEIGHT:
-
MMC
12/16/09
-
-
SHEET 5 OF 5
SURFACE FINISH
MFG/PURCH
MODEL
(INTERNAL USE ONLY)
N
EXT DRAWING
S
CALE
DISTRIBUTION
-
P
URCH
-
N
/A
-
NOTES:
1. ROOFCURB ACCESSORY IS SHIPPED DISASSEMBLED.
2. INSULATED PANELS: 25.4 [1"] THK. POLYURETHANE FOAM, 44.5 [1-3/4] # DENSITY.
3. DIMENSIONS IN [ ] ARE IN MILLIMETERS.
4. ROOFCURB: 18 GAGE STEEL.
5. ATTACH DUCTWORK TO CURB. (FLANGES OF DUCT REST ON CURB).
6. SERVICE CLEARANCE 4 FEET ON EACH SIDE.
7. DIRECTION OF AIR FLOW.
8. CONNECTOR PACKAGE CRBTMPWR002A01 IS FOR THRU-THE-CURB GAS TYPE
PACKAGE CRBTMPWR004A01 IS FOR THRU-THE-BOTTOM TYPE GAS CONNECTIONS.
TYPICAL (4) SIDES
SUPPLY AIR
R
ETURN AIR
ROOFING MATERIAL
(FIELD SUPPLIED)
CANT STRIP
(FIELD SUPPLIED)
ROOFING FELT
(FIELD SUPPLIED)
COUNTER FLASHING
(FIELD SUPPLIED)
UNIT
GASKET
(SUPPLIED WITH CURB)
RIGID INSULATION
(FIELD SUPPLIED)
DUCT
(FIELD SUPPLIED)
NAIL (FIELD SUPPLIED)
CERTIFIED DRAWING
VIEW "B"
CORNER DETAIL
SECTION THRU SIDE
SEE VIEW "B"
GAS SERVICE PLATE
THRU THE CURB
DRILL HOLE
2" [50.8] @
ASSEMBLY (IF
REQUIRED)
(SEE NOTE #8)
SEE NOTE #2
12-1/2" [317.5] WIDE
INSULATED DECK PANELS
9-15/16" [252.4] WIDE
INSULATED DECK PANEL
SUPPLY AIR
RETURN AIR
SUPPLY AIR
OPENING
RETURN AIR
OPENING
C13311
Fig. 7 -- Roof Curb Details
Summary of Contents for 549J Series
Page 4: ...4 C160144 Fig 2 Unit Dimensional Drawing 07 08 Size Units ...
Page 5: ...5 C160145 Fig 2 Unit Dimensional Drawing 07 08 Size Units cont ...
Page 6: ...6 C10757A Fig 3 Unit Dimensional Drawing 09 Size Units ...
Page 7: ...7 C10758A Fig 3 Unit Dimensional Drawing 09 Size Unit cont ...
Page 40: ...40 a549J 001 Fig 44 Typical RTU Open Controller Wiring Diagram ...