
Form 2055
6
Revision Date 5/1/2015
START-UP AND OPERATION
ELECTRIC STEAM BOILERS
WARNING
SERVICING AND START-UP MUST BE DONE ONLY BY FULLY TRAINED AND QUALIFIED
PERSONNEL.
CAUTION
BEFORE DISCONNECTING OR OPENING ANY BOILER ITEMS OR ACCESSORIES,
BEFORE CLEANING OR REPLACING PARTS OF ANY KIND, TAKE THE FOLLOWING
PRECAUTIONS:
1.
TURN OFF AND LOCKOUT ALL ELECTRICAL DISCONNECTS TO THE BOILER AND
ANY OTHER EQUIPMENT OR SYSTEMS ELECTRICALLY INTERLOCKED WITH THE
BOILER.
2.
ALL COVER PLATES, ENCLOSURES, AND GUARDS MUST BE IN PLACE AT ALL
TIMES EXCEPT DURING MAINTENANCE AND SERVICING.
2.1 LIMIT CIRCUIT CUT-OUT TEST
2 . 1 . 1 P R O T E C T I V E D E V I C E S
All operating and limit controls, and low water cutoffs must be tested for proper operation.
Section
2