Form 2055
14
Revision Date 5/1/2015
3 . 5 . 4 C O N T I N U O U S M O N I T O R I N G R E Q U I R E D
Water treatment should be checked and maintained whenever the boiler is operating. The boiler
operator should be sure that the boiler is not operating for long periods without proper water
treatment.
Water treatment may vary from season to season or over a period of time. Therefore, the water
treatment procedure should be checked not less than four times a year and possibly more
frequently as the local water conditions may indicate
3.6 SUGGESTED MAINTENANCE SCHEDULE
3 . 6 . 1 D A I L Y
Make visual inspection of gauges, monitors, and indicators and record readings in boiler
log.
Make visual check of instrument and equipment settings against factory recommended
specifications.
Check operation of float type low water cutoffs to ensure control is functioning. The lower
piping connections of float type level controls should have a suitable blowdown valve
piped into a proper drain. This valve should be opened periodically to allow any sludge
accumulated in the control to be flushed out. Consult manufacturer's instructions.
3 . 6 . 2 W E E K L Y
On units equipped with operating control, verify it is functioning correctly by adjusting
control and observing if input changes accordingly.
Make visual inspection of all fuses and electrical components making sure they are in
good operating condition..
Confirm boiler area is free of combustible materials and that there is nothing hindering
proper operation of the boiler..
Check all limit controls as specified in Section 2.1 of this manual.
Check float low water cutoff as described above.