Page 34
Boiler must be installed downstream of the gas meter for adequate gas supply.
Boiler gas connection pipe not less than a 1/2”.
4.9 Gas Supply and Piping (continued)
Suggested Natural Gas (NG) Layout
NOTE: Total gas supply capacity
must not be less than the
total demand capacity of the
connected appliances.
NOTE: Total gas supply capacity
must not be less than the
total demand capacity of the
connected appliances.
Sediment
Trap
Gas Meter
Sediment
Trap
Other Appliances
Other Appliances
Gas Regulator
(Supply Press 12˝ )
Gas Regulator
(Supply Press 12˝ )
Suggested Propane Gas (LP) Layout
Gas Meter
Summary of Contents for FT Series
Page 52: ...Page 52 4 20 Ladder Diagram ...
Page 70: ...Page 70 6 2 Fault Tree Analysis 6 2 1 1 Flame detection ...
Page 80: ...Page 80 SECTION 10 Parts 10 1 100 MBH Casing Assembly ...
Page 82: ...Page 82 Heat Exchanger Assembly 100 MBH ...
Page 84: ...Page 84 Blower Assembly 100 MBH ...
Page 86: ...Page 86 Casing Assembly 10 2 140 MBH ...
Page 88: ...Page 88 Heat Exchanger Assembly 140 MBH ...
Page 90: ...Page 90 Blower Assembly 140 MBH ...
Page 92: ...Page 92 Casing Assembly 10 3 199 MBH ...
Page 94: ...Page 94 Heat Exchanger Assembly 199 MBH ...
Page 96: ...Page 96 Blower Assembly 199 MBH ...
Page 98: ...Page 98 Notes ...
Page 99: ...The FT Series Heating Only Boiler Page 99 Notes ...