
40
Z31914_00_01
Operation Overview
8.2
General Operating Guidelines
There are several general rules and procedures that should be observed while operating
the device.
NMR Measurement
During an NMR measurement try to minimize interaction with the SamplePro hr-MAS
system, e.g. exchanging samples, as this may disturb the NMR measurement results.
The laboratory supervisor should define procedures regarding access to the unit and/or
the 5 Gauss area around the magnet.
Sample Mix-up
The laboratory supervisor should define through an SOP who should be allowed to load
or unload samples from rotor containers, and when. The operator should work carefully
and, optimally, use rotor ID barcode collars.
ID Barcode
When the rotor ID barcode is dirty it should be cleaned according to established instruc-
tion or the barcode may be incorrectly read.
Contamination of Samples
Reusing rotors may result in contamination of a new NMR sample from the old sub-
stance. Clean reusable rotors in accordance to established GLP and SOP standards.
8.2.1
Switching On the Device
1.
Press the
Power
button on the host computer.
2.
Press the
Power
button on the robot.
8.2.2
Switching Off the Device
1.
Shut down the host computer.
2.
Turn off the robot.
Summary of Contents for SamplePro hr-MAS
Page 6: ...6 Z31914_00_01 Table of Contents ...
Page 38: ...38 Z31914_00_01 Installation and Initial Commissioning ...
Page 44: ...44 Z31914_00_01 Assembling the Tray with Rotors ...
Page 57: ...57 Z31914_00_01 Operation Figure 10 14Activity History ...
Page 58: ...58 Z31914_00_01 Operation ...
Page 62: ...62 Z31914_00_01 Preventative Maintenance ...
Page 65: ...65 Z31914_00_01 13 EC Declaration of Conformity ...
Page 66: ...66 Z31914_00_01 EC Declaration of Conformity ...
Page 68: ...68 Z31914_00_01 Contact ...
Page 70: ...70 Z31914_00_01 Warning Signs ...
Page 72: ...72 Z31914_00_01 Figures ...
Page 74: ...74 Z31914_00_01 Tables ...
Page 76: ...76 Z31914_00_01 Glossary ...
Page 80: ...80 Z31914_00_01 Index ...
Page 81: ......