![Brother MFC 685CW - Color Inkjet - All-in-One Service Manual Download Page 222](http://html.mh-extra.com/html/brother/mfc-685cw-color-inkjet-all-in-one/mfc-685cw-color-inkjet-all-in-one_service-manual_53854222.webp)
6 - 6 3
Confidential
6.1.17 Engine Unit and Flushing Box
During disassembly jobs, except when removing the ink refill ASSY or engine unit (including the
maintenance unit), leave the head/carriage unit in the machine.
Before removing the head/carriage unit, ink refill ASSY or engine unit, you need to replace all four
ink cartridges with the protective part (see
(1) If the MJ/PS shield box has not been removed, you need to remove screw "e" shown on
(2) Remove the chassis support by removing the screw.
(3) Remove the screw from the rear of the engine unit.
(4) Take the carriage motor harness and purge cam switch harness out of the harness guides
provided on the lower cover.
Cutout provided in the
engine chassis
(6_53)
Chassis support
Chassis support
Engine unit
Carriage motor harness
Purge cam switch harness
Taptite, cup B M3x12
Lower cover
Ferrite core on the carriage motor harness
Summary of Contents for MFC 685CW - Color Inkjet - All-in-One
Page 7: ...v Confidential ...
Page 8: ...vi Confidential ...
Page 9: ...vii Confidential ...
Page 10: ...viii Confidential ...
Page 11: ...ix Confidential Legal limitations for copying ...
Page 12: ...Confidential CHAPTER 1 PARTS NAMES AND FUNCTIONS ...
Page 18: ...1 5 Confidential ...
Page 19: ...1 6 Confidential ...
Page 20: ...1 7 Confidential ...
Page 23: ...1 10 Confidential ...
Page 30: ...Confidential CHAPTER 2 SPECIFICATIONS ...
Page 50: ...Confidential CHAPTER 3 THEORY OF OPERATION ...
Page 99: ...Confidential CHAPTER 4 ERROR INDICATION AND TROUBLESHOOTING ...
Page 152: ...Confidential CHAPTER 5 TRANSFER OF DATA LEFT IN THE MACHINE TO BE SENT FOR REPAIR ...
Page 156: ...5 3 Confidential Cover page sample End page sample ...
Page 157: ...Confidential CHAPTER 6 DISASSEMBLY REASSEMBLY AND LUBRICATION ...
Page 250: ...Confidential CHAPTER 7 ADJUSTMENTS AND UPDATING OF SETTINGS REQUIRED AFTER PARTS REPLACEMENT ...
Page 263: ...7 11 Confidential Head Positioning Test Pattern ...
Page 267: ...7 15 Confidential Paper Feeding Check Pattern for the Paper Feed Roller ...
Page 268: ...7 16 Confidential Paper Feeding Check Pattern for the Paper Ejection Roller ...
Page 270: ...7 18 Confidential Vertical Alignment Check Patterns 600DPI 1200DPI ...
Page 273: ...7 21 Confidential Margin Check Pattern ...
Page 288: ...Confidential CHAPTER 8 CLEANING ...
Page 292: ...Confidential CHAPTER 9 MAINTENANCE MODE ...
Page 300: ...9 6 Confidential Scanning Compensation Data List a b c d e f i ...
Page 303: ...9 9 Confidential Test Pattern ...
Page 308: ...9 14 Confidential Configuration List ...
Page 315: ...9 21 Confidential Cover page sample End page sample ...
Page 320: ...9 26 Confidential Paper Feeding Check Pattern for the Paper Feed Roller ...
Page 321: ...9 27 Confidential Paper Feeding Check Pattern for the Paper Ejection Roller ...
Page 326: ...9 32 Confidential Vertical Alignment Check Patterns 600DPI 1200DPI ...
Page 329: ...9 35 Confidential Margin Check Pattern ...
Page 448: ...Confidential B Power supply PCB U S A and Canadian models ...
Page 449: ...Confidential B Power supply PCB European Asian and Oceanian models ...
Page 453: ...Confidential May 07 SM FAX067 8CAE03 1 Printed in Japan ...