![Brodie BiRotor Plus Installation & Operation Manual Download Page 7](http://html1.mh-extra.com/html/brodie/birotor-plus/birotor-plus_installation-and-operation-manual_2817567007.webp)
Page 7/26
IOM Single Case BiRotor Plus R06
Essential Instructions for Pressure Containing Equipment, Including the European Union
(Directive 2014/68/EU)
When installing the equipment the bolting must conform
to the requirements of ASME B16.5 paragraph 5.3 and to
the material requirements of ASME B16.5 Table 1B. Gaskets
must conform to the requirements of ASME B16.20.
Although it is not expected for the device to be used in a
service where it would come in to contact with unstable
fl uids, it is the end users responsibility to assess any risks
and take any precautions necessary.
It is the end users responsibility to ensure that piping and
other attachments connected to the Brodie instrument do
not place adverse stresses upon it, the design of the
instrument has not been assessed for the effects of traffi c,
wind or earthquake loadings.
It is the end users responsibility to ensure that the
instrument is mounted when required on suitable
supporting foundations.
It is the end users responsibility to install the device in a
well designed system to avoid potential hazards such as
water hammer, vacuum collapse or uncontrolled chemical
reactions.
It is the end users responsibility to provide fi re protection
measures and equipment in accordance with the local
regulations.
It is the end users responsibility to install suitable
straining and air/gas elimination systems.
The instrument has been designed without allowance for
corrosion or other chemical attack. The end user should
implement a periodic inspection and maintenance program
to ensure that none of the instruments pressure containing
components has been subject to any corrosion. It is
possible to examine the instrument for evidence of
corrosion through the inlet and the outlet.
When the ambient temperature is below the minimum
operating temperature specifi ed on the device, it is the end
users responsibility to ensure that the devise is warmed to
an appropriated temperature before being pressurized.
Do not exceed the operating pressure and temperature
limits of the instrument as stamped on the nameplates.
It is the customer’s responsibility to install this equipment
in a system that provides adequate over pressure
protection, and that limit pressure surges to 10% of the
maximum allowable working pressure of the instrument.
It is the end users responsibility to provide fi re protection
measures and equipment in accordance with the local
regulations.