OVERHEAD RIGGING
Important:
The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials should
be used, the installed device should be inspected regularly for safety.
•
Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
•
Locate the fixture in a well ventilated spot, far away from any flammable materials and/or liquids. The
fixture must be fixed
at least 50cm
from surrounding walls.
•
The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
•
Before rigging make sure that the installation area can hold a minimum point load of
10times the device’s
weight.
•
Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
•
The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
•
Don’t cover any ventilation openings as this may result in overheating.
•
The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
If you want to hang the BT-POWERJET upside-down to create downward fog jets, you have to modify the
position of the reservoir. The cap of the reservoir should always be on top of the unit
•
Remove the tube (cap) of the reservoir
•
Remove the reservoir
•
Turn the machine upside-down
•
Install the reservoir in the machine
•
Put back the tube (cap) of the reservoir.
•
Ready.
MAINTENANCE
•
Switch off the unit, unplug the mains cable and wait until the unit has been cooled down.
During inspection the following points should be checked:
•
All screws used for installing the device and any of its parts should be tightly fastened and may not be
corroded.
•
Housings, fixations and installations spots (ceiling, truss, suspensions) should be totally free from any
deformation.
•
The mains cables must be in impeccable condition and should be replaced immediately when even a
small problem is detected.