How to Access ENG mode
·
To access ENG mode, firstly make sure the incubator is unplugged.
·
Hold down buttons 2 and 3 on the keypad, then plug in the incubator (whilst
still holding the buttons).
·
Let go of the buttons once the digital display appears.
·
The screen should display the following: -
·
You are now in ENG mode.
Use buttons 2 and 3 to scroll between test functions. Use button 1 to select a test
function. The following test functions are provided:-
HEATER
Test the heater by turning it on and off. Note that the heater is
not controlled by the thermostat while in Engineering Mode.
TEMP SENSOR
Check all temperature sensors are working by viewing their
readings. There may be slight differences between readings;
these are calibrated by the digital control system.
HUMIDITY PUMP Test the humidity pump by turning it on and off. This test
bypasses the control to check the motor and connections.
HEATER RELAY
Check heater relay is working by turning it on and off. An
audible click should occur.
ALARM RELAY
Check the alarm relay is working by turning it on and off. An
audible click should occur.
BUZZER
Test the buzzer by turning it on and off.
LID SWITCH
This test does not apply to the Contaq Z6. The lid switch is part
of the Contaq X series of incubators.
Scroll to EXIT and select to finish testing. You will now return to working mode of
the incubator.