4.1.3 Electrical connection
The following actions should be performed to
connect the Brink Air Control- Ventilation
electrically:
▪
Feed the two-core wire (from the device to be
connected) through via opening at the back of
the wall bracket.
▪
Check that the cables’ ends have been stripped
in the correct manner. If this is not the case, do
so.
▪
Screw the cable to the terminal No. 1 and No.
2. Consult the installation instructions of the
device to be connected, for more information
on the correct connection.
4.1.4 Replacing the operational module in the wall bracket
Place the operational in the wall bracket mounted on the wall. Perform the following actions for this :
▪
Slide the control unit downward over
the two guide profiles. Make sure the
guide profiles of the wall bracket fit
snugly in the cutouts of the control
unit provided for that purpose.
1 = ± 25 seconds
2 = HRU ventilation
Take note!
The operational module should click onto the wall bracket. Only then is a proper electrical
connection established.
At power on the device determines which type of device is connected either a Heat Recovery
Unit or an Air Heating Unit followed by an second start-up cycle!
Brink Air Control- Ventilation 614884-B