57-DVRS50
24
INITIAL OPERATION
1. Check that the appliance is properly vented and connected to the gas supply.
2. Check that all external parts, such as door and faceplate are properly attached and
fastened.
3. Do not operate this appliance with broken, cracked glass doors or without the door (s) in its
correct (and latched) position. Do not abuse the glass by either striking or slamming shut.
4. Check that there are no fingerprints left on glass panels, as high temperature can bake
these prints on permanently.
FINAL INSTALLATION CHECK
Each Brigantia Gas Fireplace is checked and tested at the factory prior to being packaged and
shipped to our dealers and finally installed in your home. Archgard recommends that before
leaving this unit with the customer, the installer must ensure that the appliance is firing
correctly and that the electrical system is in working order.
This will include:
1. Perform leak tests of supply line, gas control valve, supply line from gas control valve and
pilot assembly.
2. Clocking the appliance to ensure the correct firing rate (see page 5 of this manual).
3. If required, adjusting the primary air to burner to ensure that the flame does not carbon or
soot.
4. Check for proper operation including correct drafting.
As a reminder, a TAG is attached to all of our gas fireplaces. This TAG is located at the gas
control valve. See Fig 21
Any alteration to the product that causes carboning or sooting that results in any
damage or requires cleaning is not the responsibility of the manufacturer.
ARCHGARD
INDUSTRIES LTD.
*** INSTALLER ***
IMPORTANT NOTICE
ALL GAS AND ELECTRICAL CONNECTIONS
** MUST ** BE CHECKED AND TESTED AT
TIME OF INSTALLATION.
Figure 21
Summary of Contents for 57-DVRS50
Page 8: ...57 DVRS50 8 APPLIANCE DIMENSIONS Surround Removed Surround Attached...
Page 27: ...57 DVRS50 27 REMOTE CONTROL SETUP AND OPERATION future option...
Page 28: ...57 DVRS50 28 REMOTE CONTROL SETUP AND OPERATION cont Future Option N A on this unit...
Page 29: ...57 DVRS50 29 REMOTE CONTROL SETUP AND OPERATION cont...
Page 30: ...57 DVRS50 30 REMOTE CONTROL SETUP AND OPERATION cont...
Page 31: ...57 DVRS50 31 REMOTE CONTROL SETUP AND OPERATION cont...
Page 33: ...57 DVRS50 33 REMOTE CONTROL SETUP AND OPERATION cont...
Page 35: ...57 DVRS50 35 CONVERSION KIT INSTRUCTIONS con t Step 7 Valve Conversion...
Page 39: ...57 DVRS50 39 WIRING SCHEMATICS Figure 25...
Page 42: ...57 DVRS50 42 NOTES...
Page 45: ...ARCHGARD INDUSTRIES 7116 Beatty Drive Mission B C V2V 6B4 Canada Website www archgard com...