57-DVRS50
21
NOTE: Do not remove any components while the appliance is hot.
Install the top of the door so the slots in the
door go over the tabs on the spring clips as
shown to the right. Swing door down making
sure it sits on top of the unit.
CAUTION: Only doors certified with
the appliance shall be used.
Beware the glass does not drop out!!
Pull the bottom spring clip out and
over the tabs on the bottom of the
door and release as shown below.
Install the glass beads directly onto the burner so
they are one layer deep and cover the entire
burner pan. Do not use other media that is not
approved by Archgard.
Glass Bead Installation
BL
AC
K
G
LA
SS
Door Installation
Summary of Contents for 57-DVRS50
Page 8: ...57 DVRS50 8 APPLIANCE DIMENSIONS Surround Removed Surround Attached...
Page 27: ...57 DVRS50 27 REMOTE CONTROL SETUP AND OPERATION future option...
Page 28: ...57 DVRS50 28 REMOTE CONTROL SETUP AND OPERATION cont Future Option N A on this unit...
Page 29: ...57 DVRS50 29 REMOTE CONTROL SETUP AND OPERATION cont...
Page 30: ...57 DVRS50 30 REMOTE CONTROL SETUP AND OPERATION cont...
Page 31: ...57 DVRS50 31 REMOTE CONTROL SETUP AND OPERATION cont...
Page 33: ...57 DVRS50 33 REMOTE CONTROL SETUP AND OPERATION cont...
Page 35: ...57 DVRS50 35 CONVERSION KIT INSTRUCTIONS con t Step 7 Valve Conversion...
Page 39: ...57 DVRS50 39 WIRING SCHEMATICS Figure 25...
Page 42: ...57 DVRS50 42 NOTES...
Page 45: ...ARCHGARD INDUSTRIES 7116 Beatty Drive Mission B C V2V 6B4 Canada Website www archgard com...