![Brigantia 240DVRS25N User Manual Download Page 19](http://html1.mh-extra.com/html/brigantia/240dvrs25n/240dvrs25n_user-manual_2810511019.webp)
24-DVRS25N
19
Before connecting the appliance to the gas supply line, double check that the appliance you
have purchased is designed for the gas type you are using. The gas type markings are located
on the certification label and also on the appliance’s gas valve.
Adequate clearance for proper installation and checking of the gas connections must be
provided.
All gas connections must be checked for gas leaks.
GAS CONNECTIONS
Have your gas supplier or a qualified gas fitter run a gas supply line into the fireplace. The line
must be properly sized and fitted according to the installation codes. Immediately upstream of the
supply connection, the fitter shall provide an accessible manual shut-off valve. When connecting
the supply line to the gas valve, the installer shall brace the gas valve to ensure that the gas valve
is not moved from its bracket. If the valve is not braced when the supply line is connected, the
valve may be moved and cause a “break” in the main burner supply line. Such damage is not
covered by the manufacturer’s warranty.
CAUTION:
The appliance and its individual shutoff valve must be disconnected from the gas
supply piping system during any pressure-testing of that system at test pressures in excess of 1/2
psig (3.5 kPa). The appliance must be isolated from the gas supply piping system by closing its
individual manual shutoff valve during any pressure-testing of the gas supply piping system at
test pressures equal to or less than 1/2 psig (3.5 kPa). Failure to do so will damage the
appliance’s gas valve. Such damage is not covered by the manufacturer’s warranty.
Natural Gas Pressure Settings:
The inlet supply or line pressure must be a minimum of 4.5” W.C. (1.2 kPa) and a maximum of
14” W.C. (3.5 kPa). The orifice is a #43 DMS (2.95 mm) drill size.
ELEVATION INPUT RATING
0-4500 ft (0-1372 M) 25,000 BTU/hr (9.1 kW)
4500 ft (1372 M) and above.
25,000 BTU/hr (9.1 kW) less 4% per 1000 ft. (305 M)
Please contact your local distributor for the appropriate orifice size you require.
Propane Pressure Settings:
The inlet supply or line pressure must be a minimum of 11” W.C. (2.8 kPa) and a maximum of 14”
W.C. (3.5 kPa). The orifice is a #54 DMS (1.85 mm) drill size.
ELEVATION INPUT RATING
0-4500 ft. (0-1372 M) 25,000 BTU/hr (9.1 kW)
4500 ft. (1372 M) and above. 25,000 BTU/hr (9.1 kW) less 4% per 1000 ft. (305 M)
Please contact your local distributor for the appropriate orifice size you require.
NOTE: THE INPUT RATING SHOULD ALWAYS BE CHECKED WHEN FIRST RUNNING THIS
APPLIANCE. To do this, reduce the background flow rate, time the meter, light the fireplace and
take another reading after 15 minutes of operation. Check with your gas supplier for the gas BTU
content at your elevation. Input is the rate of flow multiplied by the heating value of the gas (cubic
feet/hour x BTU per cubic feet). Adjust the manifold pressure so that the unit does not operate
above the rated input.
Summary of Contents for 240DVRS25N
Page 8: ...24 DVRS25N 8 APPLIANCE DIMENSIONS Surround Installed Surround Removed...
Page 24: ...24 DVRS25N 24 LIGHTING INSTRUCTIONS ON RATING PLATE...
Page 26: ...24 DVRS25N 26 REMOTE CONTROL SETUP AND OPERATION...
Page 27: ...24 DVRS25N 27 REMOTE CONTROL SETUP AND OPERATION cont...
Page 28: ...24 DVRS25N 28 REMOTE CONTROL SETUP AND OPERATION cont...
Page 30: ...24 DVRS25N 30 REMOTE CONTROL SETUP AND OPERATION cont...
Page 32: ...24 DVRS25N 32 REMOTE CONTROL SETUP AND OPERATION cont...
Page 35: ...24 DVRS25N 35 CONVERSION KIT INSTRUCTIONS CONT VALVE CONVERSION...
Page 40: ...24 DVRS25N 40 NOTES...
Page 43: ...ARCHGARD FIREPLACES 7116 Beatty Drive Mission B C V2V 6B4 Canada Website www archgard com...