24-DVRS25NB(N)-2
16
Installation Instructions Cont.
Horizontal Installation
The horizontal run must have a
1/4”
rise per foot and must meet
all local and national building codes, and must not be easily
blocked or obstructed. Termination clearances are as follows:
A.
Clearance above ground, verandah, porch, deck, or balco-
ny:
12”
minimum (30 cm.)
B.
Clearance to a window or door that may be opened:
9”
minimum (23 cm)
C.
Vertical clearance to a ventilated soffit located above the
termination within a horizontal distance of 2 feet from the
centerline of the termination:
18”
minimum (46 cm).
Note:
Clearances are to be in accordance with local installa-
tion codes and the requirements of the gas supplier.
D.
Clearance to an unventilated soffit:
12”
minimum (30 cm).
Note: Clearances are to be in accordance with local
installation codes and the requirements of the gas
supplier.
E.
Clearance to an outside corner:
9” (23
cm).
Note: Clear-
ances are to be in accordance with local installation
codes and the requirements of the gas supplier.
F.
Clearance to an inside corner:
9” (23
cm).
Note: Clear-
ances are to be in accordance with local installation
codes and the requirements of the gas supplier.
G.
Do not install above a meter/regulator assembly within 3
feet (90 cm) horizontally from the centerline of the meter/
regulator.
Note: Clearances are to be in accordance
with local installation codes and the requirements of
the gas supplier.
H.
Clearance to a service regulator vent outlet:
6’
minimum
(1.8 m)
I.
Clearance to a non
-
mechanical air supply inlet to a building
or the combustion air inlet to any other appliance:
12”
mini-
mum (30 cm)
J.
Clearance to a mechanical air supply inlet:
6’
minimum (1.8
m)
K.
Clearance above paved sidewalk or paved driveway locat-
ed on public property: refer to local code
L.
Clearance under open verandah, porch, deck, or balcony:
12”
minimum (30 cm).
Note: Clearances are to be in ac-
cordance with local installation codes and the require-
ments of the gas supplier.
M.
Maximum horizontal run
5’
after
2’
vertical rise. Liquid Pro-
pane gas
5’
horizontal run to
35’
vertical rise. Natural Gas
maximum
35’
horizontal run with
7’
vertical rise.
Note:
Clearances are to be in accordance with local installa-
tion codes and the requirements of the gas supplier.
Figure 22 –
Vent Termination Locations
Summary of Contents for 24-DVRS25NB-2
Page 4: ...24 DVRS25NB N 2 4 RATING PLATE...
Page 8: ...24 DVRS25NB N 2 8 APPLIANCE DIMENSIONS Surround Installed Surround Removed...
Page 24: ...24 DVRS25NB N 2 24...
Page 26: ...24 DVRS25NB N 2 26 LIGHTING INSTRUCTIONS ON RATING PLATE...
Page 31: ...24 DVRS25NB N 2 31 REMOTE CONTROL SETUP AND OPERATION cont...
Page 33: ...24 DVRS25NB N 2 33 REMOTE CONTROL SETUP AND OPERATION cont...
Page 38: ...24 DVRS25NB N 2 38 CONVERSION KIT INSTRUCTIONS CONT VALVE CONVERSION...
Page 44: ...ARCHGARD FIREPLACES 7116 Beatty Drive Mission B C V2V 6B4 Canada Website www archgard com...