TM
GE60 Installation Manual
580-00505, rev 0.4
14 of 30
PRELIMINARY
3 Installation
3.1 General
It is recommended that installation personnel read this section in its entirety prior to
installing the BridgeWave System. During a particular phase of installation, the user may
refer directly to the applicable subsection.
The Installation section is comprised of seven subsections covering the procedures and
guidelines for installing the BridgeWave Radio System.
Subsections 3
through
3.4
contain information necessary to prepare for the equipment
installation.
Subsection 3.5
through
3.7
covers equipment installation procedures.
Subsection 3.8
and
3.9
contains information necessary for aligning the antennas.
3.2 Equipment Packing & Unpacking
The radio system equipment will arrive in two boxes—one box for the low band radio
and one box for the high band radio. Locate the correct box (low band or high band)
before beginning installation by checking the label on the outside of the box or on the
radio itself.
It is recommended that the shipping cartons and packing materials be retained in the
event that it is necessary to return any equipment.
3.3 Equipment Inventory
Each carton is accompanied by a packing list. Verify the contents of the carton against
the packing list. Following are inventory lists for a typical system.
Qty Description
1 ea. GE60 Radio (Low band or High band)
1 ea. Wall Mount Bracket
1 ea. AC Power Adapter
1 ea. GE60 Pole Mount Kit (optional)