
Bridgeview Manufacturing Inc.
17
Loading Bales
When loading Bales into your Bale King bale processor, the following procedure should be
followed:
•
Position the tractor and the Bale King so as to be lined up to back straight into the row of
bales.
•
When close to the bale, lower the forks completely (you will feel a light vibration as the
forks bottom out against the frame.)
•
Back completely under the first bale.
•
Allow the tractor to move forward while lifting the bale, because the bale fork moves
away from the machine while loading.
•
If you are loading from the same row you can dump the bale into the machine and back
straight into the second bale.
If you are going to a different stack for the second bale only
raise the first bale enough to clear the ground. Move to the next row and align the
machine to the bale before dumping the bale into the tub. This gives you good visibility
to line up to the second bale.
•
Once you have the first bale in the tub and the second bale on the forks, raise the bale
fork about 1/4 of the way up. You can now transport to your feeding or bedding area to
begin processing.
Note:
Carry the bale as low as possible to lessen the stress on the cylinder shafts. Carrying
the bale too high may bend hydraulic cylinder shafts.
•
When the first bale has been processed, it is common practice to leave the rotor running
at full speed when loading the second bale into the bale chamber from the rear forks.
Summary of Contents for BALE KING 5100
Page 36: ...Bridgeview Manufacturing Inc 33 Gearbox...
Page 43: ...Bridgeview Manufacturing Inc 40 Rear Forks...
Page 45: ...Bridgeview Manufacturing Inc 42 Deflector Hose Cover...
Page 47: ...Bridgeview Manufacturing Inc 44 Front Tub Components...
Page 53: ...Bridgeview Manufacturing Inc 50 Fine Chop...
Page 57: ...Bridgeview Manufacturing Inc 54 Total Ration Grain Tank...
Page 58: ...Bridgeview Manufacturing Inc 55...
Page 60: ...Bridgeview Manufacturing Inc 57 HYDRAULIC AND ELECTRICAL SCHEMATICS Hydraulics...
Page 61: ...Bridgeview Manufacturing Inc 58...
Page 62: ...Bridgeview Manufacturing Inc 59...
Page 63: ...Bridgeview Manufacturing Inc 60...
Page 64: ...Bridgeview Manufacturing Inc 61...
Page 65: ...Bridgeview Manufacturing Inc 62...
Page 66: ...Bridgeview Manufacturing Inc 63...
Page 67: ...Bridgeview Manufacturing Inc 64...
Page 70: ...Bridgeview Manufacturing Inc 67 Lights Electrical Diverter Controls...
Page 71: ...Bridgeview Manufacturing Inc 68 Lights...
Page 72: ...Bridgeview Manufacturing Inc 69 Junction Box S N BK6359 up...
Page 73: ...Bridgeview Manufacturing Inc 70 Junction Box S N BK5426 6358...