Page 18
1030801 - 3 Station Top Cover Installation Instructions
Diplomat II Pour-Over Coffee Brewer
WARNING:
Read these instructions completely before continuing. Unplug the appliance and allow it to cool
before attempting to install this top cover.
Incorrect installation or operating procedures will void the warranty and may damage this
appliance.
This appliance must be electrically grounded to prevent electric shock or injury to the operator.
1.
Remove the existing top cover. If there are any wires connected to the top cover, remove them.
2.
Determine the type of switch the new top cover has, and use the appropriate diagram below when
attaching the wiring from the new top cover.
3.
Attach the white wire (#1 on the diagram below), from the new top cover to the group of white wires on the
immersion element.
4.
Attach the black wire (#3 on the diagram below), from the new top cover to the black wires on the
thermostat terminal #2. There should be a terminal available for this connection.
5.
Attach the green wire (#2 on the diagram below), from the new top cover to the ground screw on the
immersion element.
6.
Place the top cover on top of the housing, making sure the channels in the top cover line up with the
housing edges. Tap firmly on each corner of the top cover to snap the cover in place. Install the top cover
screw and tighten snug only. Test thoroughly.
(See the wiring diagram on the inside of the coffee brewer for complete wiring details.)
1039080 – Switch, Red
Switch with 4 terminals.
9919461 – Switch, Amber
Switch with 3 terminals.