background image

1.

Neoprene Jacket

2.

Pressure Pack

ALWAY RELEASE PRESSURE from the fermenter 
before removing any TC connection, fitting, 
accessory, or lid clamp connected to the 
Fermenter. Read section below on how to release 
pressure from Fermenter.

This guide will walk you through assembling 
and using your new conical fermenter.

GETTING STARTED

2.

CLEAN THE CONICAL

Before your first use, clean and rinse the conical 
along with all the parts and fittings. This will remove 
any leftover oil or dust from the manufacturing 
process. We recommend using PBW cleaner. Do 
not use bleach.

3.

WATER TEST

After cleaning and rinsing, we also recommend 
filling your conical with water and familiarizing 
yourself with its operations prior to your first use.

Before you tighten down TC clamps, make sure the 
gasket is seated properly into both flanges.

Once the gasket is in place, loosen the clamp so it 
can be fitted around the flange ends.

You do not need to use any tools for leverage 
when tightening TC clamps. Hand tightening is 
enough for a secure, leak-proof connection.

READ AND UNDERSTAND  

THIS FULL MANUAL

Before your first use, read through this full manual, 
and make sure you understand the use & warnings. 
See BrewBuilt YouTube channel for additional 
assembly videos. 

1.

First Time Working  

With TC Clamps? 

Additional Parts 

Included:

ITEM

DESCRIPTION

QTY

A

Pressure Lid

1

B

4" TC Clamp

1

C

4" TC Gasket

1

D

1.5" Blow Off Barb

1

E

Silicone Blow Off Tube

1

F

1.5" TC Clamp

3

G

1.5" TC Gasket

3

H

Conical Lid

1

I

Lid Clamp

1

J

Lid Gasket

1

K

Conical Body

1

L

1.5" TC Thermowell

1

M

1.5" TC Sample Valve

1

N

2" TC Gasket

1

O

2" TC Clamp

1

P

2" Butterfly Valve

1

Q

Flex Chamber

1

R

3/8" Leveling Foot

4

Parts List

PAGE 2 

BREWBUILT.COM

1

2

Summary of Contents for X1 Uni Pro

Page 1: ... Important Safety Information PAGE 5 7 General Use Features PAGE8 Connecting the Control Panel PAGE8 SettingYourTemperatures BREWBUILT COM WARNING Read entire manual for important safety information before using your BrewBuilt X1 Uni Conical Fermenter Failure to follow warnings could result in serious injury or death ...

Page 2: ...TC clamps make sure the gasket is seated properly into both flanges Once the gasket is in place loosen the clamp so it can be fitted around the flange ends You do not need to use any tools for leverage when tightening TC clamps Hand tightening is enough for a secure leak proof connection READ AND UNDERSTAND THIS FULL MANUAL Before your first use read through this full manual and make sure you unde...

Page 3: ...e and then work it around until barbs are fully covered THERMOWELL Place 1 5 TC Gasket and Thermowell into the open port in front of the conical just below the etched BrewBuilt Logo and fasten in place using 1 5 TC clamp SAMPLE VALVE Place 1 5 TC Gasket and Sample Valve into the open port halfway down the conical base on the front of the unit and fasten in place using 1 5 TC clamp Make sure the Sa...

Page 4: ...tself and into the lid until it is in the groove and equally distributed without stretch points Once you get the first piece of the gasket in the groove then you can use both hands to work the gasket around the lid and into the groove with your thumbs WARNING GASKET ORIENTATION Flat Side Into Lid Groove GASKET INSTALLATION With Lid Upside Down Push Flat End Of Gasket Into Lid Groove Improperassemb...

Page 5: ...on chamber using GENERAL USE BREWBUILT COM PAGE 5 IMPORTANT SAFETY INFORMATION Please read this entire instruction manual for important safety information prior to the use of your BrewBuilt X1 Uni Conical Fermenter GENERAL PRECAUTIONS Follow all instructions and warnings provided with cleaning agents when cleaning and sanitizing Fermenter Do not pick up Fermenter when full it is heavy and the hand...

Page 6: ...n to clog the blow off and airlock Do not place pellet hops whole hops oak chips or other items insulation and an AC unit The downside of these options is they require more space and take longer to cool since it s cooling the fermenting wort from the outside in Either way your BrewBuilt Conical comes with a Thermowell that allows you to insert the temperature probe from a temp controller which wil...

Page 7: ... PRV will start releasing pressure around this point Never apply more than 15 PSI to your X1 TIP Filling your keg from the bottom up will keep splashing to a minimum as beer will flow down the beverage dip tube and gently fill the keg from the bottom up Lastly pull up the PRV ring on the keg and set it in the open position to allow air or CO2 if you pre purged the keg to escape as your fresh beer ...

Page 8: ...nly go in one way Once aligned correctly they push in and rotate clockwise 1 4 turn to lock COOLING ON POWER UP SET DOWN HEATING ON FACTORY SETTINGS tS Set Point 68 CF Celsius Fahrenheit F CA Calibration Offset 0 Pt Compressor Delay 0 dS Differential 1 To change the settings hold the S button down till tS is showing about 5 seconds Using the up and down arrows find the setting you wish to check or...

Reviews: