- MODEL 740 -
Page 36
14.
Assemble tarp (37) and stops with
caps, (28,29) to top of left hand side
boards with capscrews and nuts (40).
Note: With tension on tarp, install
center stop first. Align tarp and in-
stall two outer stops.
The tighter
the tarp, the better the wear.
See
Fig. 10.
Fig. 10
15.
Insert U-joint (10) over splined cou-
pling (part of 33) and secure with
wire pin (11). Place handle exten-
sion (14) into U-joint and secure with
spring pin (12). Insert handle (13)
into extension (14) and secure with
capscrew (2) and locknut (7). See
Fig. 11.
Fig. 11
270917-11
13.
Lift tarp (37) with tubes (33,34) onto
top of left side boards. See Fig. 9.
Anchor stretch rope (23) to rod eye
(3) in end of latch plate.
270917-8
Fig. 8
270917-10
11.
Assemble pvc pipes (18,19) and con-
nectors (20) as required with plastic
adhesive (22). See Fig. 8.
12.
Insert knotted stretch rope (23)
through flatwasher (4) and plastic tube
(18-20). Place these items as an
assembly into front of large rolling
tube (33) and tap retainer (21) into
rolling tube. See Fig. 8.
Fig. 9
270917-9
• 11-19-97
SERVICE
Summary of Contents for THE GRAIN TRAIN 740
Page 13: ... M O D E L7 4 0 Page13 NOTES SERVICE ...
Page 14: ... M O D E L7 4 0 Page14 220904 08 19 97 P ARTS ...
Page 18: ... M O D E L7 4 0 Page18 N O T E S P ARTS ...
Page 20: ... M O D E L7 4 0 Page20 220906 08 19 97 P ARTS ...
Page 26: ... M O D E L7 4 0 Page26 220905 P ARTS ...
Page 32: ... M O D E L7 4 0 Page32 250931 05 19 97 P ARTS ...
Page 38: ... M O D E L7 4 0 Page38 H Y D R A U L ICA U G E RO P T ION 08 19 97 220938 ...
Page 43: ... M O D E L7 4 0 Page43 ...