![Brant Radiant Heaters DX3 Series User Manual Download Page 16](http://html1.mh-extra.com/html/brant-radiant-heaters/dx3-series/dx3-series_user-manual_2802218016.webp)
16
DX3
Series
3.0
Installation
•
Hanger Placement and Suspension
WARNING
!
Suspension of the heater must conform to applicable codes referenced in the Safety section and
these instructions.
1
Lay all radiant tubing out in the following order. Position tubes in approximate location (see figure 3.4).
• 10 ft. primary combustion chamber.
• Radiant emitter tubes.
Important!
150,000-200,000 BTU/h models must use the 10 ft. titanium alloy treated
combustion chamber as the first tube downstream of the burner control box. The combustion
chamber has a yellow identification label located on the swaged end of the tube (remove label
prior to starting up heater).
2
Mark locations for hanging points.
NOTE:
If the available hanging points do not allow for the recommended spacing then additional
hangers (P/N: TP-19B) may be necessary.
• The spacing between the burner control box mounting brackets and the first hanger should be
approximately 2’-4”(0.7 m).
• The space between the first two hangers placed on the first tube, should be approximately
8’-10”(2 m).
• The space between hangers thereafter, one per tube, should be approximately 9’-8”(2.94 m).
Hanger Placement and Suspension
Improper suspension of the tube heater may result in collapse and being crushed. Always
suspend from a permanent part of the building structure that can evenly support the total
force and weight of the heater.
Failure to maintain minimum clearance to combustibles may result in fire and/or explosion,
property damage, serious injury or death. Always maintain minimum clearances and post
Clearance Safety Limit signs (P/N: BR-SIGN) where needed.