SN2004, SN2024 - Infrared
Installation
4
8/24/2020
Bradley •
215-1071 Rev. N: ECO 20-00-015
Supplies from Above
Supplies from Below or Through Wall
Rough-In Dimensions for Supplies and Drain
Notes
Maximum flow rate required to washfountain is 1 .5 GPM . Size
supply lines accordingly .
Supplies from Below: Stub up 2-1/2" (64) .
Supplies from Above: Supplies must be located on centers of
dimensions shown to pass through washfountain shroud and
sprayhead .
Drain through floor: Stub up 3" (76) .
Type B
Centrally rising vent
(P-Trap furnished
with unit .)
Type O
Off-line vent
(P-Trap supplied by
Installer .)
Type A
Off-line vent
(P-Trap supplied by
Installer .)
Type H
Centrally rising vent
(P-Trap furnished
with unit .)
Top View
Top View
1/2" Supply: Nominal Copper Tube
1/2" Supply Through Wall (Optional): Nominal Copper Tube
1-1/2" NPT Drain
1-1/2" NPT Vent
Key
When running supplies and drain through wall, use same horizontal measurements as shown in Top View. Postion
openings above the finished floor, at the following dimensions (to center):
C
H
H
C
C
Drain: Standard Height: 19-1/4" (305)
Juvenile Height: 15-1/4" (387)
Supplies: Standard Height: 12" (305)
Juvenile Height: 8" (203)
(mm)
5"
(127)
5"
(127)
4-1/2"
(114)
2-3/4"
(70)
CL
5"
(127)
9-1/4"
(235)
4-1/2"
(114)
4-1/2"
(114)
2-3/4"
(70)
CL
8-1/16"
(205)
2-3/4"
(70)
27/32"
(21)
27/32"
(21)
9-1/4"
(235)
8-1/16"
(205)
2-3/4"
(70)
27/32"
(21)
27/32"
(21)
CL
CL
H
C
H