SN2004, SN2024 - Infrared
Installation
2
8/24/2020
Bradley •
215-1071 Rev. N: ECO 20-00-015
Supplies required for installation
• 3/8" diameter bolts and floor/wall anchors to anchor washfountain pedestal to floor and wall
• 1/2" nominal copper tubing for hot and cold water supply lines
• Standard P-trap (trap included with “B” or “H” drain type and some optional equipment)
• 1-1/2" drain lines and fittings
• Pipe sealant
Supplies recommended for installation
• 1-1/2" vent or tie pipe on types vented through washfountain column
• Caulk (may be applied between bowl and wall or backsplash and wall to avoid debris accumulation)
• Electrical cut-off switch to the unit . This feature prevents accidental water delivery during regular
maintenance and service .
WARNING
Water supply requires a flowing pressure of at least 20 psi, but no greater than 80 psi.
Make sure that all water supply lines have been flushed and then completely turned off before beginning
installation. Debris in supply lines can cause valves to malfunction.
Hardware supplied by installer must be appropriate for wall construction. Wall anchors used must have a
minimum pull-out rating of 1,000 lbs.
The Accuzone infrared activation must be connected with a 12V DC plug-in adapter. Connections to 110 VAC
can cause personal injury and will result in damage to the electronics.
IMPORTANT
Read this entire installation manual to ensure proper installation. When finished with the installation, file
this manual with the owner or maintenance department. Compliance and conformity to local codes and
ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging
material. If any parts are missing, do not begin installation until you obtain the missing parts.
Product warranties may be found under "Products" on our website at www.bradleycorp.com.