Bradley S19-690 Installation Manual Download Page 4

4

S19-690, S19-690LHS

 

Installation

10/19/2012 

"RADLEYs

215-321C Rev. U; ECN 12-05-003C

Fill tank and pressurize

CAUTION!  DO NOT open the cover until the pressure gauge reads “0.”

1.  Open the tank by pulling up on the wire handle located on top of the Quick-lock cover. Push down, rotate and remove. Make 

sure that the interior of the container is clean. Fill the container with 8 gallons of tepid potable water. 

2.  Replace the cover and secure by pulling up on the cover and down on the wire handle.

3.  After filling the tank with tepid water and before pressurizing the unit, open the activation valve to the full open position and 

remove the dust covers from the eyewash heads. 

4.  Located beneath the pressure gauge is an air valve. Remove protective cover and begin to pressurize the unit by applying 

pressured air through the valve. As soon as water begins discharging from the eyewash heads, close the activation lever 
completely. Finish pressurizing the tank to 90 psi and replace the air valves protective cover.

 

If this is the initial startup of this unit or if the unit has been unfilled and/or un-pressurized for a prolonged period of time the 
unit should be flushed out per the procedure below.

 

Prior to placing unit in service let unit stand for one hour.  If there is a noticeable pressure drop, re-pressurize and let 
stand for an additional hour.  If unit continues to exhibit pressure loss DO NOT place unit in service and consult the 
Troubleshooting guide found on page 5 of this manual.

CAUTION!  Relief valve is designed to vent automatically at 100-130 psi to prevent the tank from over pressurizing.   

If the gauge ever reads more then 130 psi immediately open the pressure relief valve manually by pulling 
up on the relief valve tab until the pressure reads zero. Remove the unit from service and consult the 
troubleshooting guide found on page 5 in this manual for steps to correct the problem.  Return the unit to 
service only when over-pressurization issue is corrected.

Flush tank

1.  Be sure the unit is assembled, filled and pressurized according to Steps 1 & 2 above, (If this is the initial start up of the unit 

the body wash spray head will not be attached to the drench hose activation valve at this time.)

2.  Discharge the water through the eyewash and hose spray (if provided with unit) for at least five minutes to flush the system.

3.  Flush all remaining fluid in the tank.

4.  Attach the body wash sprayhead (S19-690).

5.  Refill the tank and pressurize as described in Step 2 above.

2

Filling the Tank

Summary of Contents for S19-690

Page 1: ...oting 5 S19 690 Components Parts List 6 S19 690LHS Components Parts List 7 Table des mati res Avant l installation 8 Dimensions 9 Installation de la douche oculaire 9 Remplissage du r servoir 10 Entre...

Page 2: ...ay also be found under Products on our web site at www bradleycorp com This unit is to be used with tepid potable water as defined by ANSI Z358 1 Note avoid prolonged exposure to ambient heat sources...

Page 3: ...at this time Attach the eyewash yoke assembly to the tank Max torque 150 In Lbs A Attach the pressure gauge to the adapter on the pressure side of the tank with pipe sealant by installer C NOTICE Whe...

Page 4: ...uld be flushed out per the procedure below Prior to placing unit in service let unit stand for one hour If there is a noticeable pressure drop re pressurize and let stand for an additional hour If uni...

Page 5: ...sing potable water and water preservative recommended 1 Clean the inside of the tank using warm water and mild soap Rinse the tank thoroughly with warm water 2 Refill the eyewash tank with tepid potab...

Page 6: ...1 1 2 1 1 3 1 5 1 3 1 4 1 22 1 2 1 21 2 2 2 3 2 4 2 5 2 6 S45 2410 includes Items 1 21 1 3 Item Part No Qty Description 1 S39 785 1 Tank 10 Gallon 1 1 204 641 1 Operating Instr Label English 204 641FC...

Page 7: ...ch 204 641M 1 Operating Instr Label Spanish 1 2 S44 024 1 Lid Assembly 1 21 269 1410 1 Gasket 1 22 269 1642 1 Relief Valve 1 3 269 1411 2 O Ring 1 4 269 1516 1 Draw Tube 1 5 269 1515 1 Level Indicator...

Page 8: ...us la rubrique Informations techniques sur notre site Internet www bradleycorp com Cet appareil doit tre utilis avec de l eau potable ti de telle que d finie par la norme ANSI Z358 1 Remarque viter l...

Page 9: ...adaptateur avec un enduit d tanch it pour tuyau fournir c t pression du r servoir C AVIS Lors de la pose le manom tre et de la douchette maintenir la adaptateur pi ce 3 avec une cl pour viter d arrach...

Page 10: ...me doit tre purg comme indiqu ci dessous Avant de mettre l appareil en service le laisser au repos pendant une heure S il se produit une chute de pression notable le remettre sous pression et attendr...

Page 11: ...and s 1 Nettoyez l int rieur du r servoir en utilisant l eau chaude et un produit doux de savon Rincez le r servoir compl tement avec de l eau chaud 2 Refaire le plein du r servoir de douche oculaire...

Page 12: ...7 http www bradleycorp com 114 051 1 1 2 1 1 3 1 5 1 3 1 4 1 22 1 2 1 21 2 2 2 3 2 4 2 5 2 6 Pi ce R f Qt Description 1 S39 785 1 R servoir 10 gallons 1 1 204 641 1 tiquette d utilisation anglais 204...

Page 13: ...ation fran ais 204 641M 1 tiquette d utilisation espagnol 1 2 S44 024 1 Couverture 1 21 269 1410 1 Joint 1 22 269 1642 1 Soupape de s curit 1 3 269 1411 2 Bague 1 4 269 1516 1 Tube d aspiration 1 5 26...

Reviews: