Installation

11/7/08 

Bradley Corporation • 

215-163DCFW Rev. K; ECN 08-538

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it 
with the owner or maintenance department. Compliance and conformity to drain 
requirements and other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding any packaging material. If any parts are missing, do not begin installation 
until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is 
complete. Test the unit for leaks and adequate water flow. Main water supply to the 
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized 
shutoff.

 The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a 
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI 
Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify 
proper operation. This equipment should be inspected annually to ensure compliance 
with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be 
trained regarding the placement and proper operation of emergency equipment per ANSI 
Z358.1.

For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY. 

Product warranties and service parts information may also be found under ”Products” 
on our web site at www.bradleycorp.com.

Installation

THIS
SIDE

UP

Packing List




P.

O

. B

ox

 3

09

, M

en

om

on

ee

 F

all

s,

 W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Te

st-o

perate v

alv

e(s) ea

ch w

eek an

d sign 

belo

w

.

R

epor

t an

y m

alfunction

s immed

iat

el

y.

Ve

ntil(e) w

öc

hen

tlic

h im 

Te

stbe

trie

b prüf

en,

 b

est

ätigt 

dur

ch U

nter

sc

hrift.

 J

eglic

he S

törun

g s

of

or

t m

elden.

 

Date

Datum

Date

Signed

Unter

sc

hrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

ÄT

 1

S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Te

st le

 fo

nctio

nnem

ent d

es v

alv

es

 c

haque sem

aine et 

sign

e en b

as.

 S

'il y

 à quelqu

e c

ho

se qui n

e v

a p

as fait  

un

 rappor

t im

m

édiatem

ent.

 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Summary of Contents for S19-310DCFW

Page 1: ...inaci n de ducha de aspersi n y lavaojos rostro Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 5 Table des mati res Avant l installati...

Page 2: ...proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the...

Page 3: ...lant by installer to all male threaded pipe joints Use the rubber grip pad provided or a strap wrench around pipes when tightening to prevent marring Place the grip pad on the pipe then put the wrench...

Page 4: ...ned DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport imm diatement 25 26 1...

Page 5: ...Control Assembly 23 GPM 15 128 156A 1 Pull Rod 24 Long 16 113 006QX 1 Pipe 1 1 4 NPT x 7 3 32 17 269 915 1 Grip Pad not shown 18 169 025 2 Elbow 1 2 NPT 19 169 726 1 Union 1 2 Female NPT 20 113 006LQ...

Page 6: ...dates d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dangereus...

Page 7: ...e d urgence puis la douche oculaire voir page 8 Mettez du produit d tanch it non fourni sur tous les filetages m les Utilisez des tampons autour des tuyaux pour ne pas les endommager lors du serrage P...

Page 8: ...NTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport imm diatement 25 26 1 2 3 4 2 5 6 2 7 8 9 3 18 2...

Page 9: ...che 14 1 S24 187 1 Contr le du d bit 23 GPM 15 128 156A 1 Tige 24 16 113 006QX 1 Tuyau 1 1 4 NPT x 7 3 32 17 269 915 1 Tampon anti d rapant non montr 18 169 025 2 Coude 1 2 NPT 19 169 726 1 Union 1 2...

Page 10: ...be inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que...

Page 11: ...istradas por el instalador para pernos de 3 8 2 Empernar la base a las anclas del piso usando pernos de 3 8 suministrados por el instalador Paso 2 Montar los componentes 1 Montar primero los component...

Page 12: ...FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport imm diatement 25 26 1 2 3 4 2 5 6 2 7 8 9 3 18 20 18 16 22 20...

Page 13: ...87 1 Control del flujo 23 GPM 15 128 156A 1 Varilla de tiro 16 113 006QX 1 Tubo NPT de 1 1 4 x 7 3 32 17 269 915 1 Almohadilla de agarre preempaquetada 18 169 025 2 Codo NPT de 1 2 19 169 726 1 Uni n...

Reviews: