11
Installation
S19-280D, -280W, -290D, -290W, 274HDB, 274HWB, 274JDB, 274JWB
Bradley •
215-1740 Rev. C; ECN 15-05-042
12/7/2017
Assembly of Components — S19274JDB, S19274JWB
Eye/Face Wash Cover
Prepack S45-2676 includes
items 22, 24a and 24b
22
22
24a
24b
Shown in the "ON" position.
Prepack S65-339 includes items 26, 27, 28
Prepack S88-068 includes items 25, 26, 27, 28
25
26
27
28
1
2
14
15
16
S19274JWB Wall-Mount
Eyewash Base shown
Base is rotated ¼ turn
Wall
13
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date
Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
bradleycorp.com
114-051
25
21
27
26
28
24a
24b
1
2
14
13
15
16
19
22
20
30
31
Deck
29