4
S19-110SS
Installation
8/11/08
Bradley Corporation •
215-145SS Rev. H; ECN 08-517
Assembly of Components
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date
Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
16
16.1
17
18
1
2
3
4
5
5
7
8
9
13
10
14
15
12.1
11
6
12.2
12.11
12
2
1-1/4" NPT
Supply Inlet
1-1/4" NPT
Supply Inlet
NOTE: If tee
(upper Item 5) is
used as the supply
inlet, then relocate
coupling (Item 4) to
this location.
NOTE: Items 12.1–12.2 come preassembled as Item 12.