Installation 

S19-110SS

Bradley Corporation • 

215-145SS Rev. H; ECN 08-517 

8/11/08

Installation

Supplies Required:

•  (3) 3/8" floor anchors and bolts
• Pipe sealant
•  Piping to 1-1/4" NPT water supply inlet on unit
•  Adequate supply pipe supports
•  Min. 4" drain to accommodate 30 gallons per minute 

discharge for shower waste

•  OPTIONAL: sign-mounting hardware

Step 1: Secure base to floor

1.  Install three suitable anchors (supplied by installer) 

for 3/8" bolts in the floor.

2.  Bolt the base to the floor anchors using 3/8" bolts 

(supplied by installer).

Step 2: Assemble components

1.  Assemble the remaining unit components as 

shown on page 4.

•  Apply pipe sealant (by installer) to all male-

threaded pipe joints.

•  Use the rubber grip pad provided or a strap 

wrench around pipes when tightening to prevent 
marring. Place the grip pad on the pipe, then 
put the wrench over the grip pad and turn the 
pipe with the wrench.

•  Bottom edge of showerhead should be 7'-0" 

(2134mm) from floor. 

Step 3: Connect water supply

IMPORTANT:  Do not rely on Bradley’s 
Combination Unit to support supply piping.

1.  Connect water supply piping to 1-1/4" NPT inlet 

on unit (piping by installer). Provide adequate 
supports (by installer) for supply pipe using pipe 
hangers or other means.

2.  Hang the safety sign from the unit with the curtain 

hooks provided (or mount it to the wall using sign-
mounting hardware by installer).

3.  Open water supply lines. Test for leaks and 

adequate water flow.

NOTE:  All dimensions assume standard thread 
engagement. Variations in manufacturing allow for 
+/- 1/8" (3mm) per threaded joint. To fi nd the tolerance 
of a dimension, add the number of thread joints in 
between a dimension and multiply it by 1/8" (3mm).

Ø

 9" (229mm) Flange with 

(3) 

Ø

 3/8" (10mm) Holes on 

Ø

 8" (203mm) Bolt Circle

9"

(229mm)

26-1/2" 

(673mm)

7'-0"

(2134mm) 

to Floor

24"

(610mm)

3.7" 

(94mm)

41-1/2" 

(1054mm)

Summary of Contents for S19-110SS

Page 1: ...539 FAX 262 251 5817 bradleycorp com Installation 215 145SS Rev H ECN 08 517 2008 Bradley Corporation Page 1 of 5 8 11 08 S19 110SS Free Standing Drench Shower Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 5 ...

Page 2: ...oper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this product visit www bradleycorp com or call 1 800 BRADLEY Product warran...

Page 3: ...ad on the pipe then put the wrench over the grip pad and turn the pipe with the wrench Bottom edge of showerhead should be 7 0 2134mm from floor Step 3 Connect water supply IMPORTANT Do not rely on Bradley s Combination Unit to support supply piping 1 Connect water supply piping to 1 1 4 NPT inlet on unit piping by installer Provide adequate supports by installer for supply pipe using pipe hangers...

Page 4: ...Date Date Signed Signed Signed DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y à quelque chose qui ne va pas fait un rapport immédiatement P O BOX 309 MENOMONEE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 050 16 16 1 17 18 1 2 3 4 5 5 7 8 9 13 10 14 15 12 1 11 6 12 2 12 11 ...

Page 5: ...4 NPT 9 269 236 1 Reducing Bushing 10 151 001 2 Curtain Hook 11 113 006NX 1 Pipe 1 NPT x 9 12 S30 061 1 Ball Valve Assembly 12 1 S27 276 1 Ball Valve 1 with Jam Nut 12 11 161 079 1 Jam Nut only 12 2 128 142 1 Handle 13 128 156A 1 Pull Rod 24 Long 14 113 006MN 1 Pipe 1 NPT x 12 15 169 1074 1 90 Elbow 1 NPT 16 S24 191 1 Stainless Steel Showerhead Assembly 16 1 S24 187 1 Flow Control Assembly 23 GPM ...

Reviews: