Step 1: Rough in
Note: See Figure 1a below (for Standard Height) and Figure 1b on page 6 (for Juvenile Height)
when roughing in the Express®.
IMPORTANT: Flush the supply lines before making connections. Debris in supply
lines will cause the valves to malfunction.
IMPORTANT: Dimensions shown in Figure 1a are for Standard Height and in
Figure 1b for Juvenile Height.
1. Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown.
2. Rough in 1-1/2" NPT drain waste connection through wall at dimensions shown.
3. Install (8) 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by
installer) at the locations shown in Figures 1a and 1b.
(MM)
32"
(813)
28-5/8"
(727)
23-1/2"
(597)
11-3/8"
(289)
(8) 3/8" WALL
ANCHORS WITH
MINIMUM PULLOUT
RATING OF 1,000
LBS.
38-1/2"
(978)
24-3/8"
(619)
2-3/4"
(70)
17-7/16"
(443)
38-1/2"
(978)
24-3/8"
(619)
4-3/8"
(111)
1/2" NPT HOT AND
COLD SUPPLIES
OR TEMPERED
SUPPLY - STUB
OUT 2" (50) FROM
WALL
Finished
Floor
CENTERLINE
15-1/4"
(387)
1-1/2" NPT DRAIN -
STUB OUT 3-1/2"
(89) FROM WALL
Figure 1a
SS-3/AST/STD Express® Lavatory System (Standard Height)