background image

7910 Single Valve Recessed Hose Box 

Installation

2

 

1/26/2011

 Bradley 

Corporation

 • 215-1699 Rev. B; EN  10-07-009

Supplies Required:

• 

Hardware for anchoring the Hose Box to framing or wall studs

• 

1/2" NPT supply connection

• 

For optional left side supply: Teflon plumber's tape or Perma-Lok (or equivalent)

Tools Required:

• 

Security Allen Wrench (provided)

• 

Flat head Screwdriver

• 

Small crescent wrench

Rough-In Dimensions

8-5/8" (219) x 8-5/8" (219) wall opening

Top View

Front View

Side View

8-5/8"

(219)

8-5/8"

(219)

12-5/8"

(321)

10"

(254)

10"

(254)

5-7/8"

(147)

1"

(25)

4"

(102)

1-7/8"

(48)

(mm)

Security 

Allen Wrench 

(provided)

1

Mount Box in Wall

A

Remove door assembly 
prior to mounting.

B

Mount box so front edge will be 
fl ush with FINISHED wall.

Rough in support frame and mount 
box before attaching drywall or other 
wall coverings.

Unit is fully assembled at factory for right side supply. For left side supply option, 
refer to instructions on page 3 before mounting unit in wall.

Reviews: