Tel 01442 230 800 www.bpt.co.uk
Tel 01442 230 800 www.bpt.co.uk
3
4
B A B A
Connections Overview
Setup checklist for the Entry Panel
Please ensure the following for the installation:
1. For landline (PSTN) versions, a dedicated analogue PSTN (standard) line without
broadband is required for the entry panel. Ensure dial tone is present and that the
line is functional. Call Party Answer (CPA) must be enabled on the line and DTMF is
also a strict requirement.
2. For GSM versions a suitable service provider must be chosen (one with good quality
service coverage) for the location of the installation! – It would be wise to conduct
a pre-installation site-survey to select an appropriate network by using a GSM radio
analyser signal strength meter. Networks MUST be chosen by quality of service,
(Received Signal Strength Indication – RSSI and Bit Error Rate – BER) otherwise the
panel cannot function as intended. All signal tests must be carried out at the physical
location of the GSM entry panel using the antenna best suited for the panel in its
mounting position. The GSM antenna supplied by bpt might not always be the most
suitable antenna for the given installation site and hence installers must be prepared
to provide their own, in some instances a high gain GSM antenna may be required.
Any 3rd party GSM antennas must have a Male SMA connector fitted for termination
to the panel.
3. A suitable GSM SIM card needs to be provided which must first be registered to
the network (as per standard service provider requirements), have calling credit
available and its number known. A Pay-As-You-Go or Contract SIM can be used.
4. There needs to be a 230V AC mains supply nearby the entry panel location to
connect the Power Supply Unit provided by bpt UK.
5. The correct 12V DC, 1A regulated PSU which is provided MUST be installed to power
the panel and should not be used to power anything else other than the Entry Panel.
6. A suitable installation location for the GSM antenna must be provided.
7. Silicon sealant should be used in the relevant locations to prevent water ingress into
the entry panel. I.e. around the cable entry holes and the back-box. It should also
be applied on the back of the faceplate along the top and down the sides but not
along the bottom, in one continuous run. (Forming an inverted U) –
Failure to do so WILL void the warranty
8. Do not attempt to connect or disconnect any part of the entry panel
(including the GSM SIM) whilst power is applied to the Entry Panel,
otherwise the unit may be damaged.
SETUP CHECKLIST
CONNECTIONS OVERVIEW
!
SWITCH THE POWER OFF BEFORE CHANGING RELAY MODULES
AND ENSURE THAT THEY ARE CORRECTLY ALIGNED
!
!
‘OK’ LED Green flashing indicates normal operation
Relay SLOT 1 (fi
tted)
Relay SLOT 2 (fi
tted)
To external equipment
1 of 2 internal
CAN bus sockets,
both wired in parallel
Polarity Check LED * RED
ind12v and 0v have been crossed over.
* GREEN
indicates polarity OK
+12V
0V
Reserved for future use
Reserved for future use
Reserved for future use
Reserved for future use
Isolated voltage free input
Mic gain adjustment
(Can be used as a 1 call button input - See instructions)
Strike time adjustments